My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stickers on components. <br /> e. The Contractor shall confirm all items specified on bill of materials (including <br /> placement of parts in the panel schematics and panel layout sheets) have <br /> been provided and installed per specifications. <br /> f. The Contractor shall confirm the mounting security of each component by <br /> physically shaking each component without causing damage to the panel. <br /> g. All control panel labels shall be checked and labeled properly. <br /> h. The Contractor shall verify the panel construction comments have been <br /> implemented, if applicable. <br /> 2. Panel Wiring <br /> a. The Contractor shall verify all fuse types and rating; as well as ensure fuses <br /> are not damaged or blown (by verifying continuity). <br /> b. If applicable, DIN rails mounted on insulated standoffs shall be removed to <br /> verify there is no continuity between the DIN rail and back panel ground bus. <br /> Upon completion of the verification, the Contractor shall reconnect the <br /> bonding jumper. <br /> c. The Contractor shall verify each DIN rail mounted ground terminal for <br /> continuity between the ground terminal and the back panel ground bus, if <br /> applicable, <br /> d. The Contractor shall confirm all wire sizes and colors match the design <br /> specifications. <br /> e. Verification of wire number labels (clear, correct, and facing forwards) <br /> f. Verification of terminal number labels (clear, correct, and facing forwards) <br /> g. The Contractor shall confirm labeled wires are connected to the correct <br /> component terminals and blocks. <br /> h. "Tug test" to confirm proper termination on wires <br /> i. Confirm there are no loose wire strands or fraying at termination points <br /> j. The Contractor shall verify all shields are cut off and properly insulated at <br /> non-connected end of shielded wires. <br /> k. The Contractor shall ensure dual in-line package (DIP) switches, rotatory <br /> switches, and jumpers for PLC modules and other components are set <br /> correctly. <br /> 3. Power Distribution and Initial Power Up Sequence <br /> The Contractor shall perform the following sequence to verify the power distribution <br /> circuits are operating correctly: <br /> a. Verify no voltage present on the wires of the incoming power wires, terminals, <br /> and the line side of the circuit breakers. <br /> b. Turn on all alternation current (AC) circuit breakers, close all AC fused <br /> disconnect terminal blocks, and close all direct current (DC) fused disconnect <br /> terminal blocks (if applicable) that serve auxiliary DC loads, and pull out the <br /> Emergency-Stop pushbutton (if present). <br /> c. Confirm there is no direct connection between each AC phase and ground. <br /> Verify no continuity, if multiple AC sources exist check each one separately. <br /> -and neutral. <br /> City of Santa Ana - KFP 21-100 <br /> Water Resources Panel Building Services <br /> Page 16 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.