My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Only if the breaker has manual trip function). Verify that DC voltage is <br /> maintained on the output of the DC UPS. Following the test, reset the AC <br /> circuit breaker for the DC power supply and verify the DC voltage is present <br /> on the output of the DC UPS. <br /> w. If panel is equipped with DC fuses for auxiliary devices (not fuses associated <br /> with input/output (1/0) loops), close each fused disconnect terminal block one- <br /> at-a-time. Verify that the correct DC voltage is present at each of the devices <br /> served by these fuses. <br /> x. If panel is equipped with DC fuses for 1/0 loops, close each fused disconnect <br /> terminal block one-at-a-time. Verify that the correct DC voltage is present at <br /> each of the 1/0 served by these fuses. <br /> y. Verify each DC fuse de-energizes and energizes each of the devices or 1/0 <br /> points served by these fuses. <br /> z. Disconnect AC power from the panel without opening the AC main circuit <br /> breaker or AC main fused disconnect terminal block. Verify that DC voltage <br /> on the output of the DC UPS is maintained for at least 10 minutes. Following <br /> the test, reapply AC power to panel, verify the UPS is charging the battery <br /> backup. <br /> 4. 1/0 Checkout <br /> The Contractor shall verify every 1/0 point operates correctly, including ones marked <br /> as spare by completing the following: <br /> a. Configure the PLC for 1/0 checkout (PLC program, networking configured, <br /> etc.). <br /> b. Test digital inputs by applying the appropriate voltage or by applying a jumper <br /> to the field terminals and checking the status lights on the input module and <br /> appropriate tag in the controller. <br /> c. Test the digital outputs by forcing the output in the Controller and checking <br /> the status light on the output module and that the correct voltage or contact <br /> state is present at the field terminals. <br /> d. Test analog inputs by applying 3.8mA, 4mA, 12mA, 20mA, and 20.2mA to the <br /> filed terminals and checking that the tag in the Controller varies accordingly. <br /> e. Test analog outputs by forcing the output in the Controller to values between <br /> the minimum and the maximum and checking that the current at the field <br /> terminals varies accordingly. <br /> f. If the panel is equipped with any indicating lights or process displays, verify <br /> they operate correctly. <br /> The Contractor shall utilize the form in Exhibit C or an equivalent approved equal to <br /> complete the FAT. Upon completion of the witnessed FAT with a City Representative, the <br /> Contractor shall provide a UL508 certification label and supporting documentation <br /> confirming and validating proper operation of the equipment as well as conformance with <br /> quality, configuration, and testing standards. <br /> 3. POST-INSTALLATION FIELD TESTING <br /> her related <br /> City of Santa Ana -- FP 2 -100 <br /> Water Resources Panel Building Services <br /> Page 18 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.