My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equipment has been completed, the Contractor shall perform the following post-installation <br /> field verification tests: <br /> 1. Site Acceptance Test (SAT) <br /> Once system installation has been successfully completed and installed, the <br /> Contractor shall perform a site acceptance test (SAT). The Contractor shall test the <br /> full operation and functionality of the completed system in the SAT with a City <br /> Representative. The Contractor shall provide any rectifications required to complete <br /> the SAT. The Contractor shall utilize the form in Exhibit C to complete the SAT <br /> and shall advise any additional components that necessitate testing. Once all <br /> operation and functionality are confirmed and approved by City Personnel in the <br /> SAT, the Contractor shall commence on-site closeout and final completion of the <br /> project. <br /> 2. On-Site Closeout <br /> During the on-site closeout, the Contractor shall review the panel construction <br /> drawings for any redlines, changes or corrections that have been added and confirm <br /> they match in the field. The Contractor shall confirm all non-conformances have <br /> been corrected, re-tested, and signed off. The Contractor shall confirm the UL808 <br /> label has been affixed to the panel. The Contractor shall clean and vacuum the <br /> panel as well as take detailed photos after installation. <br /> 3. In-Office Closeout <br /> The Contractor shall redline all changes to the design made during construction and <br /> testing an the as-built panel schematics and shall provide all records including <br /> photos and schematics to the City upon closeout of the project. <br /> 4. PANEL DESIGN SERVICES <br /> Upon request by the City, the Contractor shall provide control panel design services that <br /> conform to City standards. Control panel designs and drawings shall contain fully <br /> engineered diagrams that specify all equipment, back panels, terminal blocks, and special <br /> components and related items. The wiring diagrams, specific 1/0, panel dimensions, items <br /> and quantity list with specific part numbers shall also be included in the designs. All wiring <br /> diagrams shall show all components, including power and control wiring, instrumentation <br /> wiring, ground wiring, terminal blocks, and their associate nameplates with terminal block <br /> termination designations, identification labels, and wire sizes, types and colors. Panel <br /> design documents shall be complete and inclusive of all information necessary for the City <br /> to utilize for construction purposes. When applicable all panel designs and schematics shall <br /> include, but are not limited to.- <br /> 1. Table of Contents <br /> 2. Drawing Symbol Key <br /> 3. Bill of Materials <br /> 4. Construction Comments and Special Instruction <br /> a. 1;;QRtr-Al WARP' F-;4er+eFBetAi1 <br /> City of Santa Ana - RFP 21-100 <br /> Water Resources Panel Building Services <br /> Page 19 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.