My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor shall meet the following minimum qualifications: <br /> 1. All work is to be performed in compliance with all applicable codes, ordinances, <br /> laws, standards, due care, and Occupational Safety and Health Administration <br /> (OSHA) safety requirements. <br /> 2. The Contractor shall have a minimum of five (5) years of experience in providing <br /> industrial control panel building services. <br /> 3. The Contractor shall possess state and local permits, licenses and certificates <br /> required by law to commence, carry, and complete the work. <br /> 4. Provide all necessary equipment to competently perform and complete work as <br /> specified. <br /> I. SAFETY <br /> Proposer shall be solely and completely responsible for the condition of the project site, <br /> including safety of all persons and properties during the performance of the work. In addition, <br /> proper safety equipment must be worn at all times. These requirements shall apply <br /> continuously until the contract is terminated and shall not be limited to normal working hours. <br /> The Contractor/Consultant shall assure that each employee or subcontractor under the <br /> contractor's supervision is trained in the work practices necessary to safely perform his or her <br /> job. <br /> J. INSURANCE REQUIREMENTS <br /> The successful bidders shall furnish the City with original copies of valid insurance policies <br /> herein required upon execution of the contract and shall maintain said policies in full force and <br /> effect at all times during the term of this contract. Said insurance policies shall comply with all <br /> requirements set forth in these specifications. Contractor(s) shall keep a current certificate of <br /> insurance at the City of Santa Ana at all times and shall immediately report any changes to the <br /> City. <br /> K. FEE SCHEDULE <br /> Contractor shall submit a fee schedule as described in Section IV.B.3 of RFP. The Well 40 <br /> and SA-7 panel design drawings provided as Exhibit A and Exhibit B respectively are to <br /> be used as the basis for completing the Fee Schedule form. No separately stated freight or <br /> deliveries will be considered. Bidders shall include all costs in the unit price bid. <br /> Furthermore, the Contractor shall submit additional labor, material and rental equipment rates <br /> along with fee schedule. Contractor's labor and equipment rate sheet shall list rates for all <br /> labor designations, equipment, rentals, and materials. The bid items specified in the fee <br /> schedule are for reference purposes only. Labor increases shall be subject to mutually <br /> agreeable terms between the City and the Contractor. The City may request related services <br /> that will be paid at the vendor's standard labor and equipment rate submitted. Fee proposal <br /> shall be outlined as follows- <br /> ---End of SCOPE OF WORK Section--- <br /> City of Santa Ana - RFP 21-100 <br /> Water Resources Panel Building Services <br /> Page 22 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.