My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. CODE COMPLIANCE <br /> All control panels shall be manufactured in accordance with: <br /> • Underwriters Laboratories Inc (UL508 & UL508A) <br /> • Institute of Electrical and Electronics Engineers (IEEE) <br /> • National Electrical Manufacturers Association (NEMA ICS 6 & 250) <br /> • International Electrotechnical Commission (IEC) <br /> • National Electrical Code (NEC) standards <br /> • National Fire Protection Agency (NFPA 70) <br /> • American National Standards Institute (ANSI) <br /> E. PROJECT MANAGEMENT AND COORDINATION <br /> When a request for service is issued to the City, the Contractor shall issue an estimate to the <br /> City's designated Project Manager. The Contractor shall not proceed with any work without <br /> the approval of the City's designated project manager. <br /> Contractors shall invoice the City on a monthly basis for all work performed during the period <br /> or provide a one-time invoice at the completion of work issued. Each invoice shall be <br /> accompanied by a summary of tasks performed, contract agreement number, results and <br /> progress on long-term tasks if any. <br /> F. SUBCONTRACTORS <br /> The use of Subcontractors is allowed, but will require approval by City prior to start of any <br /> assigned work. Upon commencement of work, the Contractor shall be responsible for services <br /> provided by any subcontractor as if Contractor were providing the services with its own <br /> organization. When a Subcontractor performs all or any park of the work, a markup shall be <br /> applied to the Subcontractor's actual cost of such work. The Contractor may add a markup of <br /> 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 <br /> percent on work added in excess of $5,000 of the subcontracted portion of the work may be <br /> added by the Contractor. <br /> G. MARKUP <br /> The following markup percentages shall be added to the Contractor's costs and shall constitute <br /> the markup for all overhead and profits (to the sum of the costs and markups, one (1) percent <br /> shall be added as compensation for bonding): <br /> 1) Labor................................................................................................ 20 <br /> 2) Materials........................................................................................... 15 <br /> 3) Equipment Rental............................................................................. 15 <br /> 4) Other Items and Expenditures.......................................................... 15 <br /> H. MINIMUM QUALIFICATIONS <br /> City of Santa Ana - RI=P 21-1 ao <br /> Water Resources Panel Building Services <br /> Page 21 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.