My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I Statement of Qualifications Water Resources Panel Building Services 1 11 <br /> SCE Power Grid and Substation Modernization <br /> OWNER AGENCY: and Upgrade Programs <br /> SOUTHERNSouthern California Edison(SCE), various power grid project sires <br /> CALIFORNIAf throughout Southern California <br /> REFERENCES -� s <br /> Karim Naim e.,r3. <br /> Engineering Support&Services <br /> 909.274.1426 <br /> karim.naim@sce.cam <br /> Brian Smith <br /> Transmission and Distribution . o+L <br /> Controls and Meter Asset Engineering <br /> 909.301,7033 + <br /> ,. <br /> Bnan.x.Smith@sre.com 4 r <br /> John P.Hamilton <br /> Construction Project Manager ~ <br /> 951.201.9679 <br /> John.P.Hamilton@sce.com Trirmax enjoys a longstanding partnership with Southern California <br /> Edison(SCE),fabrication and testing of various types of relay racks for <br /> CONTRACTS all sizes of SCE Substations throughout Southern California. We are <br /> $28.3 million total since 2009 proud to be Southern California Edison's only zero defect partner <br /> DATES <br /> 2009—Present Since 2009,Trimax has partnered with Southern California Edison(SCE)to <br /> deliver turn-key solutions for SCE's regional power grid and substation upgrades, <br /> EQUIPMENT ANC) including fabrication of relay racks,HMI/PLC racks,switch racks,and drop-in <br /> SOFTWARE mechanical-electrical equipment room(MEER)buildings.Trimax has completed <br /> over 480 projects ranging from single relay racks to fully-tested drop-in MEER <br /> Co <br /> • Confidd Confidential relHardware is buildings,which has allowed us to form a strong,collaborative relationship with <br /> ial SCE staff. <br /> • Grid Protection and Automation <br /> Equipment Trimax is a recognized and approved Automation/Protection <br /> • SCADA,HMI,and PLC Programmer for the SCE Automation and Protection Group. <br /> Programming&Integration <br /> • Fully-Configured Substation <br /> Buildings Our relevant SCE project experience includes providing assembly and wiring of <br /> relay racks,developing interconnect and connection designs,and configuring <br /> r Equipment Testing and PLCs,SCADA/HMls,relays,switches,clocks,and system alarms.A brief summary <br /> Verification of our history serving SCE includes: <br /> • 2009:Manufacture,assemble,wire and test FTO Relay Racks <br /> • 2016,Approved vendor for Factory Acceptance Testing(FAT) <br /> • 2017:Approved vendor for manufacturing and installation of SCE[[prop-In <br /> MEER buildings <br /> • 2018.Approved Automation Programming vendor for the SCE Automation <br /> and Protection Group;SCE SEMT programming certification <br /> + 2020:Awarded the$10 million SCE Metro East/Orange Region,three-year <br /> agreement <br /> C�i�t��/, Council 23 — 72 1/18/2022 <br /> TRIMFIIC 1 A TESCO CONTPOLS COMPANY Water and Waste Water Project Qualifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.