My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I Statement of Qualifications Water Resources Panel Building Services 1 12 <br /> Robert W. Goldsworthy Desalter Expansion <br /> and Completion of New Source Water Wells OWNER AGENCY: <br /> and Conveyance Pipelines Project WATER REPLENISHMENT <br /> Woter Replenishment District of Southern Colifornio, Lokewood DISTRICT OF • <br /> CALIFORNIA <br /> ii <br /> Y REFERENCE <br /> K " l Phuong Watson <br /> {" Senior Engineer <br /> 562.275.4246 <br /> pwatson@wrd.org <br /> a, * CONTRACT <br /> $1,535,584 <br /> DATES <br /> January 2016—February 201$ <br /> - EQUIPMENT AND SOFTWARE <br /> • Modicon M-580 <br /> • Ethernet/Fiber Ring Communication <br /> This project expanded the existing 5 mgd Robert W.Goldsworthy Desalter + Wonderware System Platform <br /> groundwater treatment facility to increase plant capacity and improve water SCADA <br /> quality to comply with discharge regulations.To achieve this,an additional . Wonderware InTouch Panels <br /> reverse osmosis(RO)train was added to allow for increased filtration. <br /> • Dream Reports <br /> TRIMAX was specifically responsible for upgrading the PLCs,implementing a . Win-911 Dialer <br /> new Wonderware SCADA and upgrading the plant UL control panels.The system <br /> upgrade consisted of 100+instruments,CCTV equipment,servers,computers, <br /> printer,Wonderware SCADA and associated other software. <br /> The new system was designed with minimal downtime as possible.With this, <br /> a redundant Schneider Electric Modicon M580 architecture was utilized to <br /> maintain plant level equipment operation.On top of this sat a redundant <br /> Wonderware System Platform SCADA for operators to interface,monitor and <br /> trend plant systems. <br /> To ensure accuracy and stability of the system,on-site loop testing and <br /> calibration were completed.An additional on-sit Factory Acceptance Test,proved <br /> out the control-loop functionality as outlined in the contract specification. <br /> • Design and fabrication of UL control panels using Modicon components <br /> • Programming of PLCs and SCADA software <br /> • Field instrument calibration and control system commissioning <br /> Ci�t��/, Council 23 — 73 1/18/2022 <br /> TRIMAIC 1 p TESCO CONTPOLS COMPANY Water and Waste Water Project Qualifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.