Laserfiche WebLink
KDC Systems <br /> An EMCOR Company <br /> Where required we will also develop 10 Lists.These 10 Lists will specify tag names in <br /> accordance with city standards. <br /> Where applicable, drawings will include enclosure temperature calculations, full load <br /> power calculations and UPS runtime calculations. <br /> 4. RELEVANT PROJECT EXPERIENCE <br /> 4.1 . IRWD, Baker Water Treatment Facility <br /> NO <br /> �E�kuau�tmae <br /> e. <br /> 1AP FEF� <br /> Project Size $1.8M <br /> Years 2014-2017 <br /> Overview <br /> The Baker Water Treatment Plant is a greenfield drinking water plant. It is designed to <br /> produce 28.1 Million Gallon per day. This is a regional facility, owned by 5 South Orange <br /> County water districts. <br /> KDC Scope <br /> KDC was responsible for PLC Programming, HMI Programming, Historian Configuration, <br /> Alarm Dialer Configuration, specification and procurement of server hardware, <br /> virtualization setup, Testing and Commissioning. <br /> Details <br /> Technologies deployed included Wonderware System Platform, Wonderware Enterprise <br /> Historian, VMWare Virtualized Environment, Dell Servers, Modicon PI-Cs, Win911 <br /> Cit ouncil 23 - 116 KD 8bystems <br /> An EMCOR Company <br />