Laserfiche WebLink
KDC Systems <br /> An EMCOR Company <br /> For control panels with PLCs we will verify 1/0 checkout and any applicable networks. <br /> We will configure required 1/0 in a PLC test program and verify proper digital input <br /> operation by jumpers and digital outputs by forcing and verifying relays and lights. <br /> Analog inputs will be verified using signal generators and analog outputs will be <br /> confirmed using multimeters. <br /> Once KDC has completed all testing and verification, the same test will be repeated with <br /> the City's Representative and results documented on City's Control Panel Testing form. <br /> 3.3. Post-Installation Field Testing <br /> Once system installation has been successfully completed and installed, we will perform <br /> a site acceptance test. We will test the full operation and functionality of the completed <br /> system in the SAT with a City Representative. <br /> Once all operation and functionality are confirmed and approved by the City Personnel <br /> in the SAT, we will commence on-site closeout and final completion of the project. <br /> During on-site closeout, we will review panel drawings for any redlines, changes or <br /> corrections and make sure these are implemented and captured on the drawings. We <br /> will make sure any non-conformances have been corrected and re-tested. We will clean <br /> and vacuum the panel and take detailed photos after installation. <br /> For in-office closeout we will update drawings to reflect as-built condition and provide <br /> all records including photos and schematics to the City upon closeout of the project. <br /> 3.4. Panel Design Services <br /> Upon request by the City, we will provide control panel design services that conform to <br /> City standards. <br /> Depending on the application, the drawing sets will include Panel Layouts, Power <br /> Distribution, Network Diagrams, 10 Drawings and a Bill of Materials (these will reference <br /> the Layout Drawings and part numbers). <br /> _C616ouncil 23 — 115 T KD l022 <br /> srems <br /> An EMCOR Company <br />