Laserfiche WebLink
r Dynalectric <br /> PROFESSIONAL BIO <br /> KDC Systems <br /> FMCOR Companies <br /> Greg Eso <br /> Engineering Manager <br /> 22 years with Dynalectric LA/KDC Systems <br /> 31 Years in Trade <br /> Education/Training: <br /> Electrical Engineering and Control Systems, University of Victoria,Victoria, British Columbia <br /> Professional Bio: <br /> Mr. Eso has extensive experience managing project teams in designing,installing,and testing control systems utilizing PLC, HMI, <br /> and DCS technologies across a broad range of industries including life science,water treatment,automotive,material handling, high <br /> speed sortation,and robotic palletizing. His direct responsibilities have included: <br /> • managing technical personal <br /> - providing guidance on technical issues <br /> • cost estimating and proposals <br /> - conceptual design,P&ID development,and process functional description <br /> - hardware and software specification <br /> - detailed power,control panel,and field electrical engineering <br /> • material requisition <br /> - PLC and HMI programming <br /> • installation,testing,startup,and training <br /> - documentation including drawings, user manuals,troubleshooting guides,and O&M manuals <br /> - managing people and resources in the execution of these tasks <br /> Selected Project Experience: <br /> Gilead Sciences <br /> KDC Systems is providing instrumentation and control system engineering and installation expertise to automate a new <br /> formulation and filling suite for Gilead Sciences in La Verne,CA. The process control system hardware and software are <br /> Rockwell Automation and the project is using specialty subvendors for other proprietary systems. KDC Systems is the <br /> systems integrator for the project and is responsible for instrumentation specification and procurement,control panel <br /> design and fabrication, plant network expansion to incorporate the new control hardware,vendor equipment integration, <br /> and software development,testing,and commissioning. KDC will hold workshops with the owner and develop software <br /> detailed designs,test plans,and a complete software library. Unwitnessed and witnessed testing will be conducted at our <br /> facility and repeated in the field. KDC electricians are responsible for installing,terminating,and testing all control system <br /> wiring for the project. <br /> OCWD GWRS Final Expansion <br /> Construction of the Final Expansion of the Groundwater Replenishment System for the Orange County Water District(OCWD)has <br /> begun. Located at the OCWD Advanced Water Treatment Facility(AWTF)on Ward Street in Fountain Valley, CA,the$310 million <br /> project will create an additional 30 million gallons per day of new water supplies to serve north and central Orange County. Once <br /> completed,the AWTF's total production will reach 130 million gallons per day,enough water for 1,000,000 people. The project <br /> entails expansion of the existing flow equalization, microfiltration, reverse osmosis, ultraviolet,and related support facilities. The <br /> process control system hardware and software are Emerson Delta V combined with Ethernet and Foundation Fieldbus connected <br /> control devices. KDC Systems is the systems integrator for the project and is responsible for instrumentation specification and <br /> procurement,control panel design and fabrication, plant network expansion to incorporate the new control hardware,vendor <br /> equipment integration,and software development,testing,and commissioning. KDC will develop software detailed designs and test <br /> plans. Unwitnessed and witnessed testing will be conducted at our facility and repeated in the field. KDC electricians are <br /> responsible for terminating and testing all control system wiring for the project. <br /> Project Experience under Tenure: Training and Certs: <br /> AV Thomas Electrical Engineering <br /> Starkist Rockwell Solutions Provider <br /> Skechers USA First Aid/CPR <br /> LAX Terminal 7 <br /> Toyota <br /> JPL <br /> City Council 23 — 124 1/18/2022 <br />