Laserfiche WebLink
Dynalectric <br /> PROFESSIONAL BIO <br /> KDC Systems <br /> EMCRR Companies <br /> Tuan Le, P.E. <br /> Senior Applications Engineer <br /> 15 years with Dynalectric/ KDC Systems <br /> Education <br /> • Bachelor of Science, Mechanical Engineering, California State Polytechnic University, Pomona. <br /> • California Registered Professional Engineer, Mechanical, 1995, #M29864 <br /> Selected Project Experience <br /> IRWD Biosolids and Energy Recovery Project (2017-2020) <br /> Application: Biosolids and Energy Recover Facilities <br /> PLC: Schneider Modicon Quantum, M340 <br /> Tasks: Lead team for programming and configuration of the Process Control System for new <br /> plant, including submittals, development, configuration, and testing of PLC programs, <br /> HMI templates and instances, graphics, historian, reports, and alarm dialer; setup and <br /> testing of redundant SCADA servers running on VMware ESXi; integration and testing of <br /> packaged equipment skids; field startup, device commissioning and acceptance testing. <br /> Orange County Water District Initial Expansion of GWRS (2011-2015) <br /> Application: Expansion of existing MF, RO, UV and supporting systems to increase plant water <br /> production from 70MGD to 100MGD. <br /> DCS: Emerson DeltaV <br /> Tasks: Software detail design, programming and commissioning of MF, RO and UV systems; <br /> control network and control panel power load calculations; setup and testing of motor- <br /> operated valves, variable frequency drives, power monitors, and various Foundation <br /> Fieldbus and DeviceNet devices; integration and testing of packaged equipment skids; <br /> field startup, device commissioning and acceptance testing. <br /> LAX Central Utility Plant (2011-2015) <br /> Application: Central Utility Plant SCADA system. <br /> PLC: A-B ControlLogix communicating with various vendor systems. <br /> HMI/OIT: Wonderware ArchestrA System Platform, InTouch. <br /> Tasks: SCADA System design and configuration for central utility plant and building automation <br /> system; setup alarming, historical data collection and reporting. <br /> LADWP Owens Lake Dust Mitigation, Phase 7 (2008-2010) <br /> Application: Shallow flooding 27 square miles of dry lake bed to mitigate dust <br /> PLC: A-B SLC and ControlLogix miles apart communicating via radio network <br /> HMI/OIT: GE iFIX, A-B PanelView <br /> Tasks: Project engineering, programming and commissioning; control panel design and power <br /> load calculations; software and hardware detailed design; developing FAT, SAT, training <br /> and O&M manual documentation; software and graphics development, and submittals; <br /> setup historical data collection and reporting. <br /> Orange County Water District AWTF and GWRS (2005-2008) <br /> Application: Purification of treated waste water using microfiltration, reverse osmosis and ultraviolet <br /> light; product water is used to keep ocean out of groundwater basin and to replenish <br /> drinking water supplies. <br /> City Council 23 — 125 1/18/2022 <br />