Laserfiche WebLink
REFERENCE <br />Kevin Coons, PE <br />Senior Professional Engineer <br />Engineering Analytics, Inc. <br />(previously with Hargis +Associates, <br />Inc.) <br />858.22L0264 <br />KCoons@enganalytics.com <br />PROGRAM MANAGER <br />Tony Rossi, PE <br />Engineering Manager <br />Hargis+Associates, Inc. <br />8S8.410.7449 <br />tmssi@hargis.com <br />DESIGN ENGINEER <br />Ross Horton, EIT <br />Staff Engineer <br />Hargis + Associates. Inc. <br />858.373,7649 <br />RHorton@hargis.com <br />CONTRACTS <br />$182,134 total, Hargis ♦ Associates <br />DATES <br />January 2014 - Present <br />EQUIPMENT AND <br />SOFTWARE <br />• Wonderware HMI <br />• Ignition SCADA <br />• Allen-Bradley PLCs <br />• Ethemet/Fiber Optic <br />City of Santa Ana I Statement of Qualifications Water Resource, Panel Building Services ) 9 <br />Raytheon Technologies Groundwater <br />Treatment Extraction System <br />n <br />Trimax partnered with Hargis +Associates for three major groundwater extraction <br />and treatment upgrade projects at the former Hughes Aircraft Company Facility <br />in Fullerton, California. Trimax provided design services and manufactured a <br />verity of field control panels that communicate with groundwater extraction wells <br />and associated Held instrumentation for pumping contaminated groundwater <br />from wells into various treatment systems that remove the contaminates before <br />returning clean water back into the ground for aquifer storage. <br />Groundwater Extracli and Treatment System Expansion <br />Trimax designed, fabricated, and tested the main PLC control panel to operate <br />and control a groundwater extraction and treatment (GET) system at the former <br />Hughes Aircraft Facility. The main PLC panel operates and provides status to <br />sub -panels, extraction well pumps, transfer pumps, and communicate with the <br />Trojan advanced oxidation process (AOP) system. Testing and start-up services <br />included operation of all pumps and motors, valves, filtration systems, UV -lighting, <br />carbon absorption system, storage tank control and all extraction well controls. <br />Trimax tested all interlocks, shut -down and emergency systems to confirm <br />successful system operations. <br />The challenges of integrating multipliable ground -well pumps scattered <br />throughout the Raytheon site and vicinity for this major environmental cleanup <br />included communicating control through fiber and wireless to the extraction <br />wells, integrating the water delivery systems, and manufacturing the water <br />treatment packages. <br />After a successful and on -schedule plant testing, startup, and commissioning, <br />Trimax provided deliverables including two Diagrams and Control <br />Panel Drawings with PLC Control Code. We continue to provide ongoing <br />services for upgrades and modifications to the plant controls. <br />TRIMAX 1 .s reace =,-ac, s cevaavr- ,Nate, and Nla,ce'nhte- Pro.e,r Quasi f,cau,an; <br />