Laserfiche WebLink
City of Santa Ana I Statement of Qualifications Water Resources Panel Building Services ( 13 <br />David C. McCollom Water Treatment Plant LT2 <br />OWNER AGENCIr,: Improvements <br />OLIVENHAIN Muniopcil Water Disvicf (Ut lvVD), Fncin4ns, Cnlyi0f ri,il <br />MUNICIPAL' The goal of this water treatment plant (WTP( control system Upgrade project was <br />DISTRICT to improve water quality to control microbial pathogens by installing improved <br />membrane filtration units, strainers, pump stations. aeration blowers, and <br />hydraulic energy recovery turbines. The David C. McCollom WTP is one of only <br />REFERENCE three plants in the world that have zero water waste. <br />David Smith Modifications to the 34 mgd McCollom WTP included three new UL control <br />Water Treatment Plant Manager panels, major updates to six existing panels, six new CPUs, 174 new instruments, <br />760.415.2304 and 2,000a new 1/0 points. Trimax upgraded the existing SCADA system from <br />dsmith@olivenhain.com Wonderwafe System Platform to Inductive Automation Ignition. Including <br />upgraded reporting from Operator-10. <br />CONTRACT <br />$851,800 System upgrades included controls for the new plant membrane control, blower <br />room control, backwash equalization, residuals handling, coagulants, polymers, <br />DATES caustics, citric acid, sodium hypochlorite feed system. ammonia feed, fluoride <br />2011-2013 feed, centrifuge, and solids handling facilities. Trimax integrated two operator <br />workstations In the Control Room, and five industrial PC workstations on the plant <br />EQUIPMENT AND Floor to enable operators to remotely access SCADA from any computer with the <br />SOFTWARE proper IT credentials for login. <br />• Ignition SCADA Project challenges included a 60-day plant shutdown for the installation <br />is Allen-Bradley PLCs and commissioning of all equipment before the mandatory project <br />• Ethernet/Fiber completion date. Trimax accomplished our work on -schedule. <br />Application software included. redundant controllers, ControlN et Ethernet, <br />servers, and auto -dialers. Trimax also provided PID programming, ramping <br />functions, Flow pacing, weight formulas, historical trending. operator <br />customizable trending and reporting, exponential equation reporting, and system - <br />CLIENT COMMENDATION wide monitoring and alarming. <br />YJe were suaessNl m de.nMtteeng the plant canrcds deed ma -WA ranNms and snuldi digger protMas to <br />the saosknon M COP. per Fhn is to,nlnate 2"wr operaty n his cvnmg si <br />l iliv lg this dill ;line in a single site Wait was a maim aUevenn" and d W W W not have Lead Passive wlNwl <br />rnmar and GE wines, We Ly vide win us in the ton. rove nano, WesuaR end dies., cnmges m me n, to <br />the PLC We <br />I went. to express in, sincere Nnnks to everyone et AW See Trimax GE VCM a v,10ii olad you vwd work <br />and deN®rim In goring us m this mast mxN anew of Ne mgxt <br />Raspecxuey <br />Dave S.'di <br />O—NON <br />se„�.,n.a w..,•, u,.n n, <br />Follow -On Water Dlrtributlon 5ystem and <br />Wastewater Treatment Plant Upgrades: <br />Trimax was subsequently selected to <br />upgrade the WTP Distribution System <br />SCADA application from Wonderware to <br />Ignition by Inductive Automation, with <br />TopView alarming software implemented <br />for remote dialing and alerting. Trimax <br />also upgraded the District's OMWD <br />Wastewater Treatment Plant from <br />Wonderware to Ignition. <br />Trimax provides ongoing District - <br />wide maintenance and as -needed <br />troubleshooting services. <br />TRIMAX I A TES-C, CGNTRCLS .^OMP4NII water and ./rite Waver Proles Qu iiiti-aCans <br />