My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRIMAX
Clerk
>
Contracts / Agreements
>
T
>
TRIMAX
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 1:47:39 PM
Creation date
1/28/2022 3:27:03 PM
Metadata
Fields
Template:
Contracts
Company Name
TRIMAX
Contract #
A-2022-009-02
Agency
Public Works
Council Approval Date
1/18/2022
Expiration Date
1/17/2025
Insurance Exp Date
2/1/2025
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I Statement of Qualifications Water Resources Panel Building Services ( 14 <br />Sub -Regional Water Reclamation Plants <br />Vir tfL I/ : =fir ;. lVgter Ro(lani0tio n Aar! r:i ry ('✓a✓IVv'RV ), <br />Hespeiio 0o'lA.ppie Valley, Calif )rnla <br />This $65.8 million project constructed two new individual water reclamation <br />plants (WRPs), each with capacity of one mgd, located in the City of Hesperia <br />and in the Town of Apple Valley. These new plants treat a portion of the local <br />wastewater, but all solids and the remaining wastewater balance are treated by <br />the main treatment plant in Victorville. The project also modified the existing <br />Apple Valley lift station, an existing percolation pond, and constructed a new, off - <br />site Hesperia lift station. <br />Integrated communications from specific process systems, like Fine Screens, MBR <br />and UV systems, were installed at both new plants, with a total of 13 PLCs under <br />the new Sub -Regionals network. After programming, Trimax integrated each <br />of these specific process systems into the SCADA System and provided control <br />system commissioning services including factory acceptance testing (FAT) and <br />system start-up. TRIMAX was specifically responsible for: <br />• Design and fabrication of UL control panels: <br />) 7control panels <br />) 4 electrical panels <br />4 communication and network panels <br />• Provision and calibration of 215+ instruments and 14 surveillance cameras. <br />• Programming of 7 Control Logix Allen Bradley PLC's. <br />• Design and develop 7local HMI's using FactoryTalk View and Panel View. <br />• Design, develop and integrate screens from the 7control panels in to <br />Wonder ware SCADA software. <br />• Programming included process, trending, reporting, and alarming. <br />• Field instrument calibration and loop checks. <br />• Project documentation including electrical drawings, loop checks, and <br />networking. <br />Our history serving VV W RA includes: <br />• 2017: Sub -Regional Reclamation plants. <br />• 2018: SCADA Upgrade (complete system). <br />• 2020: Regional Treatment plant, Phase 1 Control panels upgrade. <br />REFERENCE <br />Mr. Latif Laart <br />Business Applications Manager <br />760.954.5083 <br />Ilaanovvwra.com <br />DESIGN ENGINEER <br />Carollo Engineers <br />4600 East Washington Street <br />Suite 500 <br />Phoe nix, AZ 85034 <br />CONTRACT <br />$2,487,,471 <br />DATES <br />February 2017— May 2018 <br />EQUIPMENTAND <br />SOFTWARE <br />• Wonderware SCADA and <br />Reporting <br />• Allen-Bradley PLCs and Panel <br />View Plus Terminals (OITs) <br />• FactoryTalk View and Panel Yew <br />+1000 <br />• Ethernet/Fiber Communication <br />TRIMAX I A TESCC CONTRGLS-JNir^ANY Water and Waste W acer Project Q0311t'Ca [ions <br />
The URL can be used to link to this page
Your browser does not support the video tag.