My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-02-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Agenda Packet_2022-02-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 12:57:10 PM
Creation date
2/9/2022 12:15:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vivian Hang E.I.T. <br />West Athens -Westmont TOD Specific Plan, Los Angeles County, CA <br />IBI Group was tasked with developing the Mobility Element of the West Carson TOD Specific Plan. The focus of the Specific <br />Plan is to identify strategies that would leverage existing transportation infrastructure and lay the groundwork for future mobility <br />enhancements. For this project, Ms. Hang provided assistance in analyzing existing conditions relating to the street, transit, <br />bicycle, and pedestrian network, as well as identifying strategies that would improve multimodal connections within the area and <br />increase transit ridership. This task included providing in-depth corridor analyses, developing street design concepts, mitigating <br />impacts, and identifying land use and transportation policies to facilitate a safe and efficient multimodal network. <br />1-405 Renton to Bellevue ETL & Widening, Washington, CA <br />The Washington State Department of Transportation (WSDOT) is seeking to add new capacity by creating a dual express toll lane <br />system on the 1-405 between SR 167 in Renton and NE 6th Street in Bellevue. Ms. Hang worked in signal modifications of six <br />locations which includes a redesign of traffic signal heads and its phasing, conduits, loop detection, and pole locations using city <br />and county standards. <br />Santa Clara Valley Transportation Authority Facilities Master Plan, San Jose, CA <br />The Santa Clara Valley Transportation Authority (VTA) initiated this study effort to examine existing conditions at the Cerone and <br />Chaboya bus maintenance divisions, and to make recommendations for near -term improvements at both facilities to accommodate <br />near -term needs for bus storage, bus maintenance, operator and maintenance training, and paratransit vehicle storage. Ms. <br />Hang developed near -term as well as future designs for each bus facilities and the corresponding cost estimates. Designs include <br />reconfiguring the employee/visitor parking, paratransit parking, bus parking, and light rail track and storage at both the Cerone <br />and Chaboya bus facilities. <br />Purple Line Extension & First -Last Mile Plan, Los Angeles, CA <br />IBI Group is developing systemwide First -Last Mile Guidelines for LA Metro and First -Last Mile Plan for the four transit stations <br />that comprise Sctions 2 and 3 of the Los Angeles Metro Purple Line Extension across Interstate 405, identifying needs and <br />potential solutions for station access and connectivity improvements, including active modes of transportation. Ms. Hang <br />worked on creating various configurations of traffic lanes for roadway segments in question to provide optimal and efficient <br />designs. These designs include incorporating bike lanes without removing on -street parking as well as on -street parking bulb -out <br />strategies. Standard and protected bikes lanes were utilized in the configurations to enhance bicycle ridership. Additionally, Ms. <br />Hang assisted in identifying locations where wayfinding signs were needed to provide further active transportation connectivity <br />within the network. <br />North San Fernando Valley BRT Corridor, Los Angeles, CA <br />The Los Angeles Metropolitan Transportation Authority (Metro) is seeking alternative analysis for a proposed implementation of <br />a bus rapid transit in the North San Fernando Valley. This bus rapid transit system will connect key activity centers, reduce traffic <br />congestion, improve regional transit connectivity, and promote transit -oriented communities (TOC). Ms. Hang created exhibits of <br />various configurations of traffic lanes in order to accommodate the BRT route of alternative alignments using MicroStation as well <br />as performing traffic impact analysis at each intersection with and without the project. She assisted in the redesign of signing and <br />striping along the corridors to incorporate dedicated bus lanes and bikeways. <br />Hurontario Light Rail Transit, Toronto, ON <br />This project is proposing to implement a light rail transit in the middle of the corridor of Hurontario Street located in Toronto. <br />This light rail will connect the cities of Mississauga and Brampton from Port Credit to Brampton Gateway Terminal with 22 stops <br />along the way. Ms. Hang worked in identifying properties along the entire corridor that were needed to obtained in order for the <br />construction of the light rail. She gathered necessary information such as the property index numbers (PIN), addresses, and <br />property owners for all parcels located on both sides of the corridor. She aided in the redesign of signing and striping as well. <br />TRIP Centennial Corridor, Bakersfield, CA <br />The Centennial Corridor Project proposed to construct a new alignment and provide route continuity and traffic congestion relief <br />by connecting State Route 58 and Interstate 5 in the City of Bakersfield. The Thomas Roads Improvement Program (TRIP) is a <br />collective effort put forth between the City, County of Kern, Caltrans, and the Kern Council of Governments in order to relieve <br />stress on outdated infrastructure by utilizing land along the freeway to create multi -use paths. Ms. Hang assisted in identifying <br />necessary right-of-way needed for the new alignment as well as preparing MicroStation sheets. Additionally, she assisted in the <br />redesign of ADA curb ramps, signing, and striping. <br />City Council 17 — 237 2/15/2022 <br />11131 GROUP ON -CALL TRANSPORTATION AND TRAFFIC ENGINEERING SERVICES - RFP NO. 21-125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.