My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KDC SYSTEMS (2)
Clerk
>
Contracts / Agreements
>
K
>
KDC SYSTEMS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 4:42:57 PM
Creation date
2/14/2022 2:31:21 PM
Metadata
Fields
Template:
Contracts
Company Name
KDC SYSTEMS
Contract #
A-2022-009-01
Agency
Public Works
Council Approval Date
1/18/2022
Expiration Date
1/17/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KDC Systems <br />An EMCOR Company <br />4.4. Los Angeles World Airports, LAX Central Utilities <br />Plant Upgrade <br />W1 0 <br />Project Size $43M <br />Years 2010 - 2016 <br />Overview <br />KDC developed a 'Balance of Plant' control system for the new LAX Central Utilities <br />Plant. The Wonderware System Platform SCADA System provided visualization for the <br />Central Utilities Plant and also for Air Handling Units distributed throughout the airport. <br />Process values were captured and historized to a Wonderware Historian <br />KDC Scope <br />Our scope included all PLC and HMI programming along with the design and fabrication <br />of all Control Panels <br />Details <br />The heart of this system consisted of Redundant Control Logix Processors. These <br />controllers communicated with multiple geographically dispersed systems over <br />protocols including Ethernet, BACNet and Modbus. <br />A library was developed using Wonderware Templates and Logix Modules. Standard <br />Logix Modules were developed. These modules utilized User Defined Tags (UDTs) for <br />public interfaces. and were comprehensively documented. The SCADA system was <br />deployed in a VMWare Virtualized environment consisting of 3 physical servers, each <br />hosting 5 virtual servers with Dual Redundancy <br />This was a very challenging project. It is always challenging working in a fast -paced <br />environment like an airport. Implementation mistakes had the potential to cause severe <br />Page 116 <br />_ KDC Systems <br />An EMCOR Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.