Laserfiche WebLink
= KDC Systems <br />An EMCOR Company <br />discomfort to the thousands of daily travelers and commercial discomfort to LAWA who <br />have commitments to their customer airlines. <br />As the 'Balance of Plant' integrator we were required to interface with multiple <br />equipment vendors. The airport is physically and organizationally dispersed. Every <br />terminal has its' own systems and service contracts which made this a very difficult <br />project to manage.0ur schedules had to be constantly revised to ensure that specific <br />modules were ready and tested to coincide with changing construction and installation <br />schedules. <br />KDC Systems met our customer's requirements through careful planning and <br />coordination with all parties. <br />4.5. City of Santa Ana - Various Projects <br />Well 21, South Station Well Integration, Wells 16&33 <br />Control Panels, SA-5 Vault Modifications, Walnut <br />Pump Station, Cambridge Bypass, Santa Ana SA-7 <br />Radio Repeater Panels & Well 20 Meter Integration <br />5.REFERENCES <br />IRWD, Baker Water Treatment Plant <br />Scott To I a n d, PE <br />Senior Engineer, Baker WTP Construction Manager <br />(949) 458-4200 Baker WTP direct <br />(760) 822-3194 mobile <br />toland@irwd.com <br />Orange County Water District, AWTF / GWRS <br />Jay Kalinowski <br />Process Control and System Manager <br />T - (714) 378-3250 <br />jkalinowski@ocwd.com <br />Page 117 <br />KDC Systems <br />An EMCOR Company <br />