My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-09-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
09/07/2021 Regular
>
AGENDA PACKET_2021-09-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 11:18:04 AM
Creation date
2/22/2022 11:03:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Bristol Street and Memory Lane <br />Intersection Widening <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP I <br />CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The proposed improvements would involve the widening of Bristol <br />Street just north of Memory Lane to accommodate an additional <br />through southbound lane. Additionally, the proposed improvements <br />would include the construction of sidewalk, curb and gutter, <br />pavement, signal modification, and curb ramps. . <br />EXHIBIT 2 <br />PROJECT NEED: <br />Bristol Street north of Memory Lane has three southbound lanes except <br />at the intersection where only two southbound and one right turn lane <br />exist. An additional southbound through lane is needed to complete the <br />City's plan to widen Bristol Street from Warner Avenue to Memory Lane <br />on the north, which was approved by City Council in 1990 and re- <br />evaluated in 2001. <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27128 <br />Construction 1,012,500 - - - - - - <br />TOTAL 1,012,500 - - - - - - <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24125 FY 25126 FY 26/27 FY 27/28 <br />MM2:ICE 1,012,500 - - - - - - <br />TOTAL 1,012,500 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works CIP Engineering Kenny Nguyen, Senior Civil Engineer 21-July-2021 <br />11 <br />City Council <br /> 19 – 10 <br />9/7/2021 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.