Laserfiche WebLink
PROJECT TITLE: <br />Fairview Bridge and Street <br />Improvements: 9th St to 16th St <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The proposed improvements would include the widening of Fairview <br />Street with a cross section of 100' wide right-of-way and and will <br />include 3lanes in each direction, raised median, Class II bike lane, <br />and 8' wide sidewalk with tree wells. Additionally, the proposed <br />improvements would entail widening of the Fairview Street Bridge, <br />relocation of existing utilities, including several power poles, street <br />lights, and partial acquisition of 2 parcels. <br />PROJECT NEED: <br />Fairview Street is currently a four -lane undivided arterial between 9th <br />Street and 16th Street. This segment of Fairview Street currently <br />carries 38,544 vehicles per day (VPD) and has a volume to capacity of <br />(VIC) ratio of 1.03. At this VIC ration, this roadway segment operates at <br />an unacceptable level of service. LOS F exists where the traffic stream <br />is extremely difficult. With the proposed improvements, this roadway <br />segment will improve to acceptable LOS B. <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27128 <br />Right -of -Way 1,937,250 - - - - - - <br />Construction 3,721,590 <br />TOTAL 1,937,250 3,721,590 - - - - - <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24125 FY 25126 FY 26/27 FY 27/28 <br />MM2: ACE 1,937,250 3,721,590 - - - - - <br />TOTAL 1,937,250 3,721,590 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works CIP Engineering Kenny Nguyen, Senior Civil Engineer 21-July-2021 <br />13 &nbsp; <br />City Council <br />&nbsp;19 &ndash; &nbsp; 11 <br />9/7/2021 <br />&nbsp; <br />