My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-09-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
09/07/2021 Regular
>
AGENDA PACKET_2021-09-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 11:18:04 AM
Creation date
2/22/2022 11:03:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Warner Avenue Improvements: <br />Phase 2 - Oak to Grand <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will widen Warner Avenue between Oak Street and <br />Grand Avenue from 2 to 3 lanes in each direction. The project will <br />also include additional left turn lanes at Grand Avenue, bus pads, <br />raised medians, and a protected bike lane. <br />as <br />FTraffic <br />ECT NEED: <br />H (Master Plan of Arterial Highways) Strategic Plan Technical <br />entified the need for Warner Avenue to be widened to a six - <br />or arterial to meet MPAH requirements. The existing Average <br />ffic (ADT) is in excess of 29,600 vehicles per day. The <br />improvements will allow the segment to accommodate future <br />lumes at a Level of Service A and increase operational <br />. <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27128 <br />Construction 9,076,305 - - - - - - <br />TOTAL 9,076,305 - - - - - - <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24125 FY 25126 FY 26/27 FY 27/28 <br />MM2: ACE 9,076,305 - - - - - - <br />TOTAL 9,076,305 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works CIP Engineering Kenny Nguyen, Senior Civil Engineer 21-July-2021 <br />14 <br />City Council <br /> 19 – 12 <br />9/7/2021 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.