My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEED ELECTRIC, INC.
Clerk
>
Contracts / Agreements
>
L
>
LEED ELECTRIC, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:50:21 AM
Creation date
3/3/2022 2:38:18 PM
Metadata
Fields
Template:
Contracts
Company Name
LEED ELECTRIC, INC.
Contract #
A-2022-025-02
Agency
Public Works
Council Approval Date
2/15/2022
Expiration Date
2/14/2025
Insurance Exp Date
10/1/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ ��� <br />`CCU <br />ELECTRIC <br />RFP For On -Call Electrical Repair & Rehabilitation Services <br />LEED Electric, Inc. Statement of Qualification <br />Project No. 8 <br />Project Name <br />Advanced Water Treatment Demonstration Facility <br />Location <br />Carson, CA <br />Owner <br />Metropolitan Water District of Southern California <br />Project Manager Name <br />Joe Robles,586 P.E. <br />E-mail and Telephone No. <br />(909)392-2 <br />JRobles@mwdh2o.com <br />Contract Value <br />$4,039,000.00 <br />(including change orders) <br />New Ground up Advanced Water Treatment Demonstration Facility with <br />0.5MGD Clean Water Production. Systems installed MSR, Chemical Feed <br />Brief Description of Firm's Scope of <br />System, RO System, Advanced Oxidization UV. Turn Key Electrical and <br />Work for the Project <br />Instrumentation which included Prefabricated Electrical Building, Service <br />Switchboard, MCC, VFD's, Main PLC (1,500 1/0's), RTU, Local Control Panels, <br />(11) Analyzer Racks, Ammonia, PLC & SCADA, Programming, Testing, Start- <br />up & Commissioning. <br />Completion Date <br />December 2019 <br />Project No. 9 <br />Project Name <br />Hyperion Secondary Effluent Pump Station Improvements <br />Location <br />Playa Del Rey, CA <br />Owner <br />West Basin Municipal Water District <br />Project Manager Name <br />Kevin Cullen, MSCE <br />E-mail and Telephone No. <br />(310) 660-6259 <br />KevinC@westbasin.org <br />Contract Value <br />$3.080,000.00 <br />(including change orders) <br />Brief Description of Firm's Scope of <br />Furnish & Install Electrical Ductbank, Medium Voltage Switchgear, Control <br />Work for the Project <br />Panels, DCS System, Motor Control Center and Pumps, 4160V, Qty (2) 600A <br />with Main -Tie -Main Circuit Breaker <br />Completion Date <br />January 2020 <br />P a g e 124 13138 Arctic Circle, Santa Fe Springs, CA 90670-5508 LEED Electric Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.