Laserfiche WebLink
L.CCY <br />ELECTRIC <br />RFP For On -Call Electrical Repair & Rehabilitation Services <br />LEED Electric, Inc. Statement of Qualification <br />Project No. 10 <br />Project Name <br />Venice Dual Force Main & Pumping Plant Generator Replacement <br />Location <br />Venice, CA <br />Owner <br />City of Los Angeles, Bureau of Engineering <br />Project Manager Name <br />Richard Southerland <br />E-mail and Telephone No. <br />(310)301-2109 <br />Richard.southerland@lacity.org <br />Contract Value <br />$4,688,790.00 <br />(including change orders) <br />Brief Description of Firm's Scope of <br />Replacement of Generators, furnish and install Instrumentation and <br />Work for the Project <br />Controls, Underground conduits, wire, cable and controls. <br />Completion Date <br />Jan. 2020 <br />Project No. 11 <br />Project Name <br />Valencia Water Reclamation Plant UV Disinfection Facilities <br />Location <br />Valencia, CA <br />Owner <br />Santa Clarita Valley Sanitation District of Los Angeles County <br />Project Manager Name <br />JelmerTorres <br />E-mail and Telephone No. <br />(562) 699-7411 <br />jtorres@lacsd.org <br />Contract Value <br />$3,633,922.00 <br />(including change orders) <br />Brief Description of Firm's Scope of <br />Furnish and install new UV Disinfection System, infrastructure, including 2 <br />Work forthe Project <br />Unit Substations, MCC's VFD's, Control Panels, Instruments, Commissioning <br />and Startup Services. <br />Completion Date <br />March 2021 <br />Project No. 12 <br />Project Name <br />Greg Avenue Pressure Control Structure Pump Modification and New <br />Control Building <br />Location <br />Sun Valley, CA <br />Owner <br />The Metropolitan Water District of Southern California <br />Project Manager Name <br />Joe Robles, P.E., (909) 392-2586, JRobles@mwdh2o.com <br />E-mail and Telephone No. <br />Shane Singh, (303) 995-1287, shane.ramcharansingh@stantec.com <br />Zakir Hirani, (626) 375-6780, zakir.hirani@stantec.com <br />Contract Value <br />$3,539,258.00 <br />(including change orders) <br />New pump station building, infrastructure, including new LADWP <br />Brief Description of Firm's Scope of <br />Substation, MV Switchgear, MV VFD's, 4160V switchgear, 1,200AMP, <br />Work for the Project <br />temporary 4160V switchgear, bus duct, security system, control panels, <br />flow meters, PLC and programming, commissioning, and startup. <br />Completion Date <br />Feb. 2021 <br />P a g e 125 13138 Arctic Circle, Santa Fe Springs, CA 90670-5508 LEED Electric Inc. <br />