My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-04-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Agenda Packet_2022-04-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 11:39:43 AM
Creation date
4/18/2022 10:54:36 AM
Metadata
Fields
Template:
City Clerk
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
969
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - PROPOSAL <br />GEORGINA COLE LIBRARY RENOVATION <br />CARLSBAD CA <br />The City of Carlsbad commissioned Group 4 to renovate two <br />of its three libraries to modernize library service, improve <br />operations, and freshen the library experience while preserving <br />the desirable qualities of the two buildings. <br />The 24,000 SF Georgina Cole Library, located next to City Hall, <br />was built in 1967. The design introduced a variety of new spaces <br />for collaborative work, community meeting and gathering, and <br />expanded programs almost entirely within the mid-century <br />building's existing walls. <br />Group 4's redesign capped the central courtyard and <br />incorporated it into a contiguous library interior. This dramatically <br />opened up the inside of the library, improved circulation and <br />wayfinding, and established stronger connections between <br />the two floors. Modernization included reconfiguration of <br />technology and stacks as well as replacement of furniture, <br />finishes, and carpets. <br />The project also addressed lifecycle maintenance and <br />accessibility upgrades, including exterior repairs, ADA <br />improvements, and modern mechanical, low voltage, and fire <br />prevention systems. <br />COMPLETED 2016 <br />PROJECT TEAM <br />Jonathan Hartman, Principal Architect <br />Andrea Gifford, Principal Designer <br />David Schnee, Design Director <br />CLIENT CONTACT <br />Patrick McGarry <br />Project Director, Red Brick Consulting <br />(Former Civic Projects Manager, <br />City of Carlsbad) <br />(760) 802-4521 <br />W <br />U <br />Z <br />W <br />W <br />a <br />X <br />W <br />H <br />Z <br />Q <br />W <br />J <br />W <br />N <br />Z <br />O <br />Q <br />V <br />U_ <br />J <br />Q <br />CJ <br />U_ <br />O <br />Z <br />W <br />W <br />a <br />tA <br />r <br />m <br />a <br />w <br />ry <br />U <br />w <br />U <br />Q <br />O <br />Cie <br />City Council <br />23-97 <br />4/19/2022 <br />Ln <br />
The URL can be used to link to this page
Your browser does not support the video tag.