My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-04-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Agenda Packet_2022-04-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 11:39:43 AM
Creation date
4/18/2022 10:54:36 AM
Metadata
Fields
Template:
City Clerk
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
969
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - PROPOSAL <br />LL <br />O <br />W <br />d <br />O <br />U <br />N <br />N <br />m <br />a <br />w <br />U <br />w <br />H <br />U <br />Q <br />O <br />oe <br />O <br />We will work with the City, the Library, and our consultant team to develop a <br />comprehensive cost model to inform early decision -making about the project scope <br />and design options. We will strive to identify and include all hard costs of construction <br />(including demolition, site preparation and development, building construction, <br />sustainable design features, utility connections/upgrades as applicable, etc.); public <br />and staff FFE and shelving; technology infrastructure; graphics and signage; and <br />other real — and significant — costs associated with public projects. We will build in <br />assumptions for soft costs, permits, testing, PM/CM services (if any), and even costs <br />for moving and temporary storage as appropriate. We will also build in realistic <br />contingencies and escalation factors. <br />Task 1 Meetings and Deliverables <br />• Project work task plan and schedule <br />• Pre -Design summary report <br />• Preliminary project cost model <br />• Two (2) PMT meetings including kickoff <br />• One (1) focus group with Library staff <br />TASK 2: CONCEPT DESIGN <br />Based on the City's confirmed scope and budget established in Task 1, we will develop <br />up to three (3) conceptual design options for the Santa Ana Library renovation. We will <br />work closely with the PMT to review and refine the options for presentation to Library <br />staff and the community. Community engagement events (up to three) may include a <br />combination of open house/public meetings, pop-up surveys in community locations, <br />a digital survey, etc. <br />Using our project cost model, we will prepare a project budget for each option. We <br />will work with the PMT to analyze and evaluate the conceptual options, taking into <br />account staff and community input, to select the preferred conceptual option. <br />During this phase, Luci Creative will lead a collaborative discovery process to reimagine <br />the Children's Library with a focus on children's learning, flexible programming space, <br />interactive areas, museum style spaces, wall graphics, and signage to be integrated <br />holistically within the redesigned Children's Library. <br />We will conduct a technical meeting with the City's Planning and Building Agency to <br />confirm the preliminary code analysis and other relevant requirements relative to the <br />proposed scope of work. <br />We will refine the preferred conceptual design based on staff and community input, <br />the results of the IDW, and input from our technical meetings with City staff. We will <br />develop renderings of the exterior and interior renovations, and prepare the Concept <br />(Schematic) Design drawings. We will prepare narratives describing the building and <br />options for major systems. <br />We will meet with the Historic Resources Commission to confirm the historical project <br />requirements established in the previous phase and present preliminary exterior <br />design recommendations. At the City's option, we also present the project to other <br />City oversight bodies (e.g., the Planning Commission) and/or City Council. <br />City Council 23 — 106 <br />N <br />N <br />4/19/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.