EXHIBIT 2
<br />Project Number: CAR-1
<br />Current
<br />Dyer 18, LLC- 1815 Carnegie
<br />January 2022
<br />Drawn as of
<br />Outstanding
<br />Revised Budget as
<br />Remaining Funds
<br />Reason for Change
<br />Comments
<br />Schedule of Values'
<br />Budget
<br />3/22/22
<br />Invoices (not
<br />of 3/22/22
<br />Needed
<br />*At time conceptual bid was provided, the budget
<br />drawn on)
<br />was an educated guess as plans were not yet
<br />generated.
<br />- Increase in sewer line size from 4 inches to 6. The original "as -built" plans from Gensler showed the existing condition as 6 inches.
<br />-Additional plumbing for the pump in the back yard.
<br />- Public Works required replacement of Fire and Domestic water in the street.
<br />- Increase in material cost
<br />Rough Plumbing
<br />$ 792,240
<br />$ 773,386
<br />$
<br />$ 843,386
<br />$ 70,000
<br />Unforeseen Circumstance and Change of Scope
<br />- Overtime
<br />- Emergency lighting changes
<br />-Additional bug -eye
<br />- Redo lounge room 105 electrical per City's request
<br />- Additional underground conduits that were not expected
<br />- Rework dorm lighting
<br />Electrical
<br />$ 1,089,046
<br />$ 1,032,170
<br />$
<br />$ 1,074,170
<br />$ 42,000
<br />Unforeseen Circumstance and Change of Scope
<br />-Overtime
<br />Switchgear
<br />$
<br />$ 34,665
<br />$
<br />$ 34,665
<br />$
<br />Unforeseen Circumstance and Change of Scope
<br />- Switchgear needed to be expedited per the City's request
<br />- Framed upstairs which was not part of the original scope -Framing Square footage increased substantially due to framing of the
<br />mezzanine.
<br />- Original assumptions had us using ICF, however we needed to use wood framing which increased material cost by 25%
<br />- Lumber prices have greatly increased in the past year
<br />- Fire treated wood had to be used at the front that we were not anticipating to have to use. Never had to use on any other project.
<br />Rough Framing
<br />$ 880,000
<br />$ 946,191
<br />$ 18,589.79
<br />$ 974,469
<br />$ 9,688
<br />Change of Scope and increase in material cost
<br />- Overtime
<br />- Increase in cabinetry scope (after 1st round of plans were produced)
<br />Finished Carpentry
<br />$ 110,948
<br />$ 89,629
<br />$ 1,730.80
<br />$ 112,860
<br />$ 21,500
<br />Change of Scope
<br />- Front entrance area reception doors needed to be changed from original plan
<br />HVAC
<br />$ 785,O0O
<br />$ 607,590
<br />$ 89,019.00
<br />$ 785,O0O
<br />$ 88,391
<br />Change of Scope and increase material cost
<br />- Increase in material cost and change in scope (after 1st set of plans were produced)
<br />HVAC Engineering
<br />$
<br />$
<br />$
<br />$ 8,682
<br />$ 8,682
<br />Change of Scope
<br />-Needed to re -engineer the ducting runs
<br />HVAC Freight for RUUD Equipment
<br />$
<br />$
<br />$
<br />$ 5,O0O
<br />$ 5,O0O
<br />Change of Scope
<br />- Needed to expedite per the City's request
<br />Captiveaire Equipment
<br />$
<br />$
<br />$
<br />$ 23,500
<br />$ 23,500
<br />Change of Scope
<br />- Not part of original scope
<br />- Required to protect the unused upstairs area, which was not part of 1st set of plans
<br />Fire Alarm System
<br />$ 204,000
<br />$ 4,967
<br />$ 183,874.45
<br />$ 208,968
<br />$ 20,126
<br />Change of Scope
<br />- Upgraded to a voice activated system
<br />Fire Sprinklers
<br />$ 245,700
<br />$ 151,070
<br />$
<br />$ 259,070
<br />$ 108,000
<br />Unforeseen Circumstance and Change of Scope
<br />- Increase in sprinkler heads because of conflict with lighting system and bathroom plumbing -Fire safety requirement
<br />- Upsizing of fire water line
<br />Underground Utilities
<br />$ 225,000
<br />$ 213,574
<br />$ 25,564.50
<br />$ 264,138
<br />$ 25,000
<br />Unforeseen Circumstance and Change of Scope
<br />- Public works required replacement of Fire and Domestic Water main in the street.
<br />Edison
<br />$ 181,967
<br />$ 200,677
<br />$
<br />$ 200,677
<br />$
<br />- Underestimated overall cost of work needed to be done
<br />- Rains caused sub to need to recondition the soil
<br />Concrete Work (Interior & Exterior)
<br />$ 475,O0O
<br />$ 600,905
<br />$ 60,651.79
<br />$ 783,435
<br />$ 121,878
<br />Change of Scope and increase material cost
<br />- Rebar cast significantly increased
<br />Light Post
<br />$
<br />$ 6,000
<br />$
<br />$ 6,000
<br />$
<br />Shade Sales - Concrete
<br />$
<br />$ 18,000
<br />$
<br />$ 18,000
<br />$
<br />Paving
<br />$ 125,000
<br />$
<br />$
<br />$ 140,000
<br />$ 140,000
<br />Change of Scope and increase material cost
<br />- Patch work requested by Public Works
<br />Roofing
<br />$ 139,500
<br />$ 48,825
<br />$
<br />$ 143,825
<br />$ 95,000
<br />Elevator
<br />$ 206,700
<br />$ 206,700
<br />$
<br />$ 218,700
<br />$ 12,000
<br />Increase in Labor Cost
<br />- Potential change order for prevailing wage
<br />Architect
<br />$ 432,275
<br />$ 429,212
<br />$
<br />$ 429,212
<br />$
<br />Civil Engineer
<br />$ 22,000
<br />$ 23,987
<br />$
<br />$ 23,987
<br />$
<br />- Engineering needed for roof work
<br />- Cut in for rear exit door
<br />Structural Engineer
<br />$ 36000
<br />$ 46,448
<br />$ 1,923.75
<br />$ 57,371
<br />$ 9,000
<br />Change of Scope
<br />- Roof screening engineering
<br />Demo/Excavation/Shoring
<br />$ 325:000
<br />$ 337,267
<br />$ 13,663.77
<br />$ 375,931
<br />$ 25,000
<br />Change of Scope
<br />- Excavation for additional concrete work
<br />Consulting
<br />$ 37,723
<br />$ 29,017.80
<br />$ 2,901.78
<br />$ 37,723
<br />$ 5,804
<br />Extended Timeline
<br />- Timeline for project extended
<br />Shoring Tower Rentals
<br />$ 12,000
<br />$ 15,506.70
<br />$
<br />$ 27,905
<br />$ 12,398
<br />Unforeseen Circumstance
<br />-Assumed Turelk's original contract after taking over which included an unknown dismantle charge of$12,398
<br />Equipment Rental
<br />$ 17,843
<br />$ 16,745.92
<br />$ 1,547.18
<br />$ 21,387
<br />$ 3,094
<br />Extended Timeline
<br />- Timeline for project extended
<br />Permit/Fees
<br />$ 439,391
<br />$ 439,391.40
<br />$
<br />$ 439,891
<br />$ 500
<br />Change of Scope
<br />- Permit fee for shade structure
<br />Security Services (up to June 151h)
<br />$ 38,660
<br />$ 39,546.00
<br />$
<br />$ 39,546
<br />$
<br />- Because we were not allowed to use ICF construction method, scope of the drywall/insulation project was increased by 25%. - Framed
<br />upstairs which was an increase in scope -Framing Square footage increased substantially due to framing of the mezzanine.
<br />Drywall/Insulation
<br />$ 900,000
<br />$ 1,143,308.63
<br />$ 191,414.59
<br />$ 1,528,104
<br />$ 193,381
<br />1 Change of Scope and increase in material cost
<br />-Third layer of drywall was required by building and safety in all of the corridors causing a large increase in material and labor
<br />Sleeping Cubbies/FRP
<br />$
<br />$ 10,000.00
<br />$
<br />$ 40,451
<br />$ 30,451
<br />Change of Scope
<br />- Changed from melamine to FRP
<br />Bathroom/FRP
<br />$
<br />$ 13,356.45
<br />$
<br />$ 13,356
<br />$
<br />Change of Scope
<br />- Changed from melamine to FRP
<br />Fireproofing
<br />$
<br />$ 9,962.12
<br />$ 8,967.26
<br />$ 33,636
<br />$ 14,707
<br />Change of Scope
<br />Shaft Wall Framing/Drywall/Wallboard
<br />$
<br />$
<br />$ 92,316
<br />31 $ 92,6
<br />Change of Scope
<br />Tile
<br />$ 150,000
<br />$ 154,603
<br />$ 1,573.79
<br />$ 156,177
<br />$
<br />Second Floor Tile
<br />$
<br />$
<br />$
<br />$ 20,000
<br />$ 20,000
<br />1 Change of Scope
<br />City Council 26 - 42 4/19/2022