EXHIBIT 2
<br />Doors/Windows
<br />$ 297,000
<br />$ 280,579
<br />$ 41,341.91
<br />$ 390,121
<br />$ 68,200
<br />Change of Scope
<br />The following doors were added to the scope:
<br />- Wood doors (City decision to upgrade material)
<br />- 2 hour glass door
<br />- Dining room accordion door
<br />- Rollout door
<br />- Glass bifold door
<br />- City requested to order more doors due to previous order being late
<br />Fold -Up Door
<br />$ 49,000
<br />$
<br />$ 6,960.53
<br />$ 6,961
<br />$
<br />Change of Scope
<br />CMU Block Wall
<br />$ 160,000
<br />$ 199,202
<br />$
<br />$ 199,202
<br />$
<br />Change of Scope and increase in material cost
<br />- Significant increase in material cost
<br />Stucco for CMU Block Wall
<br />$
<br />$ 20,000
<br />$ 15,021.24
<br />$ 65,021
<br />$ 30,000
<br />Change of Scope
<br />- Preferred method of ICF was rejected by building and safety
<br />Shade Structures
<br />$ 100,000
<br />$ 40,333
<br />$ 10,618.81
<br />$ 120,952
<br />$ 70,000
<br />Increase in material cost
<br />- Steel prices have increased dramatically over the life of the project
<br />Shade Sales
<br />$
<br />$ 10,000
<br />$
<br />$ 10,000
<br />$
<br />Interior Finishes(Floor/Wall)
<br />$ 300,000
<br />$ 65,467
<br />$ 126,191.09
<br />$ 215,258
<br />$ 23,600
<br />Change of Scope
<br />Interior Paint
<br />$
<br />$ 60,004
<br />$ 45,710.48
<br />$ 105,714
<br />$
<br />Upstairs Carpeting
<br />$
<br />$
<br />$
<br />$ 24,230
<br />$ 24,230
<br />Change of Scope
<br />- Looking for less expensive substitutes
<br />Upstairs Vinyl
<br />$
<br />$
<br />$
<br />$ 77,389
<br />$ 77,389
<br />Change of Scope
<br />- Looking for less expensive substitutes
<br />Grind and Seal
<br />$
<br />$
<br />$ 73,074
<br />$ 73,074
<br />$
<br />Change of Scope
<br />Epoxy Kitchen
<br />$
<br />$
<br />$ 21,555
<br />$ 21,555
<br />$
<br />Change of Scope
<br />Exterior Finishes/Landscaping
<br />$ 25,000
<br />$ 27,031
<br />$
<br />$ 27,031
<br />$
<br />Playground/Fencing
<br />$
<br />$
<br />$ 11,470
<br />$ 13,470
<br />$ 2,000
<br />Change of Scope
<br />Exterior Fencing
<br />$
<br />$
<br />$
<br />$ 4,000
<br />$ 4,000
<br />Change of Scope
<br />Plant/Tree Allowance
<br />$
<br />$
<br />$
<br />$ 13,000
<br />$ 13,000
<br />Change of Scope
<br />Pea Gravel
<br />$
<br />$
<br />$
<br />$ 4,000
<br />$ 4,000
<br />Change of Scope
<br />Fiber Glass Bender Board
<br />$
<br />$
<br />$
<br />$ 600
<br />$ 600
<br />Change of Scope
<br />Backyard Turf
<br />$
<br />$
<br />$
<br />$ 4,500
<br />1 $ 4,500
<br />Change of Scope
<br />Irrigation
<br />$
<br />$
<br />$
<br />$ 5,000
<br />$ 5,000
<br />Change of Scope
<br />Sod Grass
<br />$
<br />$
<br />$
<br />$ 5,000
<br />$ 5,000
<br />Change of Scope
<br />Exterior Painting
<br />$ 75,000
<br />$
<br />$
<br />$ 64,286
<br />$ 64,286
<br />Change of Scope
<br />- Recently added to the scope as there was additional work to repair and complete work not completed by the former contractor
<br />Camera/Security System
<br />$ 140,000
<br />$ 72,436.85
<br />$ 12,752.73
<br />$ 152,440
<br />$ 67,250
<br />Change of Scope
<br />- Not part of original scope (part of FF&E)
<br />Lighting Package
<br />$ 200,520
<br />$ 221,335.09
<br />$
<br />$ 228,335
<br />$ 7,000
<br />- Needed to substitute lights because of back order and new lights were more expensive
<br />Roof Screening
<br />$ 76,146
<br />$
<br />$
<br />$ 76,146
<br />$ 76,146
<br />Change of Scope
<br />- City permitting process required roof screening
<br />Roof Framing Allowance
<br />$ 300,000
<br />$
<br />$ 21,225.70
<br />$ 300,000
<br />$ 78,774
<br />Change of Scope
<br />Column Replacement
<br />$ 25,000
<br />$
<br />$
<br />$
<br />$
<br />Unforeseen Circumstance and Change of Scope
<br />Miscellaneous
<br />$ 100,000
<br />$
<br />$
<br />$ 100,000
<br />$ 100,000
<br />- Per City, amount determined per discussions with City Staff.
<br />COVIDTesting
<br />$
<br />$
<br />$ 3,380.00
<br />$ 3,380
<br />$
<br />Site Cleanup
<br />$
<br />$
<br />$ 8,000.00
<br />$ 28,000
<br />$ 20,000
<br />Unforeseen Circumstance
<br />- PWA mandating cleanup at the site
<br />Rolling Gates and operators
<br />$
<br />$
<br />$
<br />$ 50,000
<br />$ 50,000
<br />Change of Scope
<br />- Planned to use existing gates, but deemed unusable
<br />Rec Area Gates and Hardware
<br />$
<br />$
<br />$
<br />$ 25,000
<br />$ 15,000
<br />Change of Scope and increase in material cost
<br />Subtotal
<br />$ 9,643,660
<br />$ 8,639,089
<br />$ 998,724
<br />$ 11,655,203
<br />$ 2,017,391
<br />General Conditions
<br />$ 1,055,923
<br />$ 1,066,077
<br />$
<br />$ 1,055,923
<br />$
<br />Extended Timeline
<br />- Timeline for project finish date extended due to design and permitting delays; scope of work increased
<br />Overhead/Main Office
<br />$ 269,077
<br />$ 258,923
<br />$
<br />$ 269,077
<br />$
<br />Extended Timeline
<br />- Timeline for project finish date extended due to design and permitting delays; scope of work increased
<br />Total
<br />$ 10,968,660
<br />$ 9,964,089
<br />$ 998,724
<br />$ 12,980,203
<br />$ 2,017,391
<br />City Council 26 - 43 4/19/2022