Laserfiche WebLink
electrical gear, controls etc., will be separated prior to the demolition as much as <br /> possible. All metal materials recycled as part of this project will be documented with <br /> weight tickets which will be provided to City of Santa Ana. These materials will be <br /> hauled to the following recycling facilities: <br /> Ecology Recycling <br /> Santa Fe Springs <br /> 3.5 CONCRETE AND ASPHALT RECYCLING <br /> Clean concrete debris from the demolition activities will be stockpiled and then <br /> shipped off for re-cycling. Ail concrete and asphalt that is hauled off the project site <br /> will be recycled and tickets will be provided to City of Santa Ana. This type of <br /> recycling does not get weighed but each end dump load we haul off is equivalent to <br /> 20 tons. The owner will be provided trucking tickets that show the number of loads. <br /> As of this writing all concrete material will be shipped to <br /> Arcadia Reclamation <br /> 1270 Arrow Hwy <br /> Irwindale, CA <br /> 3.6 DEMOLITION DEBRIS DISPOSAL <br /> All demolition debris that will not be recycled by IDI will be loaded into semi-end <br /> dumps and hauled to a disposal facility for further recycling or landfill. The end dumps <br /> will be covered prior to leaving the site. 80% by weight of the construction and <br /> demolition debris be diverted from landfills by a combination of recycling and re-use. <br /> This includes interior soft debris (i.e. drywall, plaster, ceiling tiles, roofing material, <br /> etc.). Demolition debris will be hauled to the following disposal facilities: <br /> Azusa land Reclamation <br /> 1211 W Gladstone St <br /> Azusa, CA <br /> 3.7 SWPPP <br /> Interior Demolition, Inc. will maintain all SWPPP requirements. This includes but is not <br /> limited to BMP's, shaker plates and straw waddles. <br /> 4.1 DUST CONTROL <br /> IDI will control dust generation with physical barriers (such as ,perimeter fencing with <br /> windscreen) and/or soil wetting. Excavation areas shall be secured and water will be <br /> used to control any fugitive dust from blowing onto other properties. The Site will be <br /> controlled and no excavation will be conducted in times of high wind conditions (e.g. <br /> wind speed in excess of 25 miles per hour). Converse will conduct air monitoring at <br /> S' . <br /> City Council 22 — 130 5/3/2022 <br />