My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The water will be available via a water truck or a metered discharge from a fire <br /> hydrant located proximate to the Site. IDI will control dust generation by spraying <br /> water prior to daily work activities, during excavation/loading activities (as necessary <br /> to maintain concentrations below action levels), and at truck staging locations. <br /> Watering equipment will be continuously available to provide proper dust control. <br /> We will also be using wet methods during all demolition practice to insure worker <br /> safety for silica. <br /> PROJECT MANAGER MARCO MOLINA (818) 262 -1611 <br /> City Council 22 — 131 5/3/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.