Laserfiche WebLink
Exhibit 1 <br /> 4.9 Spot Removal <br /> 4.9.1 Remove heel marks, gum, stains, etc. daily being careful to not damage the floor. <br /> Areas affected by removal of marks, gum, stains, etc. shall be refinished <br /> following Hillyard's refinishing specifications. <br /> 5.0 Approved Supplies <br /> 5.1 Restroom <br /> 5.1.1 Toilet Tissue-Acclaim White Singlefold Interfolded Bath Tissue# 10101 — 00 <br /> 5.1.2 Scott Bathroom Roll Tissue, item # 05102 20, 4.4 x4.5 inches. <br /> 5.2 Approved Cleaning Supplies <br /> 5.2.1 For cleaning urinals and commodes Colossus #1605 <br /> 5.2.2 For cleaning polished and brushed chrome Sheila Shine <br /> 5.2.3 Metal/Chrome polish Sheila Shine <br /> 5.2.4 Disinfectant Versatile #180 <br /> 6.0 BUILDING SECURITY <br /> The Contractor's shall provide the City at the beginning of the agreement a matrix listing the <br /> name of his/her custodians, what buildings they will service, what time the buildings will be <br /> serviced, what vehicles they drive (make, model and license number). This information will be <br /> copied to the Santa Ana Park Rangers and the Santa Ana Police Department for security <br /> purposes. <br /> The contractor shall keep all exterior doors locked during the performance of work or as <br /> otherwise directed and shall ensure that all doors are locked at the end of the shift unless <br /> otherwise noted. Offices with security systems shall have them activated immediately after work <br /> is completed in that area. The Contractor shall be responsible for any lost keys, card keys and <br /> any inherent damages (i.e., re-keying of whole facility). This cost shall be withheld from <br /> contractor's payment(s). The decision to re-key the whole facility is solely that of the City's <br /> Representative. <br /> 7.0 EQUIPMENT USAGE <br /> There shall be no usage of City equipment, telephones, or facilities by the contractor's staff. The <br /> City may ask the contractor to remove staff from the site if they are found to be in violation of <br /> this policy. Electrical power (110) volts will be furnished by the City at existing power outlets <br /> for the contractor's use to operate such equipment as is necessary in the conduct of his work. The <br /> Contractor shall be responsible for any damage caused to the electrical outlets and their covers <br /> caused by the improper disconnection of equipment. Cold water will also be made available as <br /> necessary for cleaning. <br /> 8.0 EXTRA WORK <br /> It is the City's intent to keep parks and other public recreational sites in a beautiful and <br /> exceptionally well-maintained condition. This specification is designed to continuously improve <br /> parks and public recreational sites. It is with this intent in mind that the City's Representative <br /> may consider authorizing extra work. Extra work will not be initiated without written <br /> authorization. In ememencv-situations, a not to exceed price may be submitted by contractor via <br /> (.itv Qni inril 7c, — 77 R/q/9n99 <br /> City of Santa Ana RFP 22-031 <br /> Page 20 <br />