My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 <br /> e-mail for review/approval by City. <br /> The City's Representative may request that the Contractor submit proposals for extra work in <br /> order to improve the grounds-landscape in the contract sites. The Contractor shall submit <br /> proposals using the City's Proposal for Extra Work Spreadsheet. The Contractor shall complete <br /> the spreadsheet in its entirety using his/her proposed extra work pricing (that is a part of this <br /> agreement) in order for the proposal to be considered. City reserves the right to request <br /> materials/equipment receipts with invoices. All labor shall be quoted on a "not to exceed" basis <br /> and City will only pay for labor actually incurred. City will pay up to 15% mark-up on parts and <br /> materials. <br /> 9.0 CITY INSPECTION <br /> The Director's Representative shall regularly inspect City property subject to this Agreement. If <br /> said inspection results in discovery of work that is not performed in the manner, and to the <br /> professional degree set forth in the Specifications, The Contractor agrees that the City shall; 1) <br /> withhold from Contractor's next monthly payment, the City's actual or estimated cost of <br /> performing the work; or, 2) hire a contractor or City staff to perform the work not performed and <br /> then withhold from the Contractor's next monthly payment the City's actual cost for performing <br /> the work to bring the property into conformance with the specifications. Additionally, City shall <br /> impose liquidated damages of up to $300.00 per inspection, per park, per item specified herein <br /> not performed, per day not meeting the specifications during any such inspection. <br /> Furthermore, it is not the Director's Representatives responsibility to inform the Contractor when <br /> work specified in the specifications was not performed or that deficiencies exist. It is the <br /> Director's Representatives responsibility to inspect the properties to verify that work was <br /> performed to the specified level of quality and timeframe followed by reporting that the work <br /> was performed satisfactorily or not. It is the Contractor's responsibility to provide adequate <br /> supervision and staffing to perform all aspects specified in this agreement. Should the Director's <br /> Representative create Power Point punch lists, essentially performing the Contractor's <br /> Supervisor's responsibilities/duties of determine what work needs to be performed in accordance <br /> with the agreement specifications, the City shall deduct $300 per Power Point punch list from the <br /> Contractor's monthly invoice. <br /> (.itv r.ni inril <br /> City of Santa Ana RFP 22-031 <br /> Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.