SCOPE OF WORK: Santa Ana Senior Center <br />Siemens Scope of work is to furnish and install cameras at the Santa Ana Senior Center. <br />Siemens to provide Video Surveillance software, hardware, and licenses for the <br />extension of Santa Ana Milestone System. Below is a detailed scope of work: <br />Detailed Scope of Work: <br />1. Siemens to provide and program one (1) Milestone NVR to support (10) new IP <br />cameras. NVR will have the have the capability of recording (10) cameras at 15 <br />frames per second at 50%motion for 365 days. <br />2. Siemens to provide and install (10) new IP cameras. <br />3. Siemens to cable all cameras back to the Siemens provided POE Switch. <br />4. Siemens to provide (10) Milestone camera licenses. <br />5. Siemens shall provide basic programming and commissioning of (10) cameras <br />into the Milestone System. <br />6. Siemens shall provide a project manager, and field specialist for installation and <br />commissioning of described systems. <br />Material List: <br />Milestone Video Management System <br />• (10)- VMS Device Licenses <br />• (1) Server- Recording at 15 FPS for 365 Days <br />• (10) Camera <br />• (1) POE Switches <br />Estimated Total $90,500.00 <br />ASSUMPTIONS AND EXCLUSIONS FOR ALL PROJECTS ABOVE <br />1. Siemens assumes existing workstations shall be used for viewing of cameras. <br />2. UPS and Network rack to be excluded from this scope of work. <br />3. Siemens excludes engineering drawings from this scope of work. <br />4. 120 VAC connections and supply to be provided by others as required. <br />5. Work is assumed to be preformed during normal business hours Monday- Friday (7AM- <br />5PM) <br />6. Pricing includes standard ground shipping. <br />7. Pricing includes one (1) year warranty on materials and labor. <br />8. Performance or Payment bonds are excluded. <br />9. Construction permits to be excluded. <br />10. Costs associated with schedule acceleration, project meetings, multiple trips onsite due to <br />incompletion of others, or multiple unplanned phases are excluded. <br />11. Patching and Painting is excluded from Siemens scope. <br />Page 7 of 8 <br />