My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HCI ENVIORNMENTAL & ENGINEERING SERVICE
Clerk
>
Contracts / Agreements
>
H
>
HCI ENVIORNMENTAL & ENGINEERING SERVICE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 11:30:40 AM
Creation date
7/25/2022 3:08:26 PM
Metadata
Fields
Template:
Contracts
Company Name
HCI ENVIORNMENTAL & ENGINEERING SERVICE
Contract #
A-2022-074
Agency
Police
Council Approval Date
5/17/2022
Expiration Date
5/31/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ballistics Water Tank <br />• HCI Environmental to provide lead certified workers, supplies and equipment. <br />• Santa Ana Police Department personnel will lockout/tag out HVAC firing range <br />units before work commences. <br />• Pump approximately (275) gallons of RCRA lead liquid from Ballistic Firing Test <br />Tank located in the warehouse.Y, <br />• Wet wipe/mop concrete tank prYsing our proprietary de -lead solution. <br />• Containerize all debris/waterforF;proper disposal as hazardous waste <br />RCRA(D008). <br />• Manifest, label, profile, trq"sport�and dispose of all lead contaminated <br />water/.debris in U.N. approvO-6 containers to a•Statb;and Federally regulated <br />disposal facility.O <br />• We estimate the scope bf work toobe completed nF I working day with 2 techs. <br />• Any areas of unseal porous.concret fjo ring=couul„'d require a concrete sealer to <br />bring lead contamination down. to acceptaple.levels. <br />• Any required concrete floor sever aped �,ylkl techs is not part of the bid <br />and will require a change order. <br />• Replace media filter for the filtration sy��tem of the tank, to be provided by the <br />Santa Ana Police Department. <br />• Labor for this project will be based on prevailing wages. <br />• All lead remediation will be handled according to local, state and federal <br />regulation. <br />• Hazardous Waste transportation and disposal to include the following: <br />1-275 gallon tote and 55 gallon drum of Hazardous Waste Water/debris <br />
The URL can be used to link to this page
Your browser does not support the video tag.