My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HCI ENVIORNMENTAL & ENGINEERING SERVICE
Clerk
>
Contracts / Agreements
>
H
>
HCI ENVIORNMENTAL & ENGINEERING SERVICE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 11:30:40 AM
Creation date
7/25/2022 3:08:26 PM
Metadata
Fields
Template:
Contracts
Company Name
HCI ENVIORNMENTAL & ENGINEERING SERVICE
Contract #
A-2022-074
Agency
Police
Council Approval Date
5/17/2022
Expiration Date
5/31/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lead Dust Clean Up <br />• HCI Environmental to provide lead certified workers, and equipment to provide <br />quarterly cleaning of ranges. <br />• Santa Ana Police Department personnel will lockout/tag out HVAC firing range <br />units before work commences. <br />• Post lead warning signage and se" ontainment area with 6 mil poly plastic <br />and seal all critical barriers. <br />• HEPA vacuum and apply we, riga nts to remove lead dust & bulk debris <br />from the following areas �a <br />o Upper range bac stno = tch basin <br />o Lower range baIotci basin <br />o Upper range I <br />o Lower range lanes.11�:., <br />o Upper range shooting x tion <br />o Lower range shootings bons <br />o Range patrol vehicle trai Yo!it in range <br />o Range master office _ <br />o Corridor <br />o HVAC units <br />o Duct work ventilation system within the gun range and work area <br />o Upper level restroom <br />o Lower level restroom <br />• Manifest, label, profile, transport, dispose and containerize lead contaminated <br />water and debris in UN approved containers for transportation/disposal. <br />• We estimate the scope of work to be completed in 1 working day with 2 techs. <br />• Labor for this project will be based on prevailing wages. <br />• All lead remediation will be handled according to local, state and federal <br />regulation <br />• Hazardous Waste transportation and disposal to include the following: <br />4-55g open top drums of lead contaminated debris/water. <br />
The URL can be used to link to this page
Your browser does not support the video tag.