81Page <br />Project Parameters / Caveats <br />Change Order: Any work that is added to or deleted from the original scope of this proposal that alters the original <br />costs or completion date must be agreed upon by both parties in the form of a written change order. <br />Proprietary Information: The information contained in this document is proprietary to VectorUSA and intended to <br />be used as evaluative and / or bidding information only. No part of this document may be disclosed, reproduced <br />and/or distributed to anyone except the listed recipients within this package without written permission from <br />VectorUSA. <br />Add & Delete: Any additional work requested outside of the scope of work will be considered as separate work and <br />addressed in <br />the form of a written change order. This proposal is not to be used as an "add & delete" schedule. <br />Defective Materials: If, due to problems with the existing hardware and / or materials provided by the client or <br />other third parties, here is a delay and / or VectorUSA is unable to perform the work outlined in the scope of work <br />it will be addressed in the form of a written change order. <br />Extraordinary Service: Certain additional charges related to extraordinary levels of support or out-of-pocket costs <br />incurred by VectorUSA, through no fault of its own, shall be reimbursed to VectorUSA by the client under this <br />agreement. <br />Examples of costs reimbursable under this section include, but are not limited to 1) shipping expenses related to <br />unusual site handling fees (e.g., extra distance, no loading dock, extra stairs, extra demurrage charges); 2) storage <br />or special handling expenses incurred if an installation site is not able to accept delivery as scheduled; 3) expenses <br />incurred by VectorUSA to resolve network compatibility issues caused by a client's election to substitute non- <br />VectorUSA provided equipment or services; and 4) expenses incurred by VectorUSA for additional installation time <br />and / or materials caused by a site not being prepared as called for in this proposal. VectorUSA shall promptly notify <br />the client in writing of such charges. Notification will be provided, when feasible, prior to the incurrence of such <br />charges, unless circumstances preclude such prior written notification (by way of example, but not limited to, <br />unusual site handling charges). Provided the incurrence of such charges is not due to VectorUSA's fault or <br />negligence, VectorUSA shall be entitled to an equitable adjustment in the prices herein, the delivery schedule, or <br />both, to reflect such charges and any related delay. <br />Schedule: VectorUSA plans to implement this project in a continuous fashion or following the baselined schedule if <br />submitted as part of this project. If delays or changes are introduced that are outside of VectorUSA's control, and <br />those changes result in additional cost those costs will be addressed in the form of a written change order. <br />Delays: The client must provide five (5) working days advance notice of any delays that will impact this project. If <br />proper notice is not provided VectorUSA reserves the right to issue a work stoppage change order. Additionally, idle <br />time incurred due to the absence of required escorts, clearance, permits, inability to enter the workplace, delays <br />by othertrades or other factors beyond VectorUSA's control will be addressed in the form of a written change order. <br />Workdays / Overtime: All work will be performed during VectorUSA's standard business hours of lam - 5pm, <br />Monday — Friday, or as specified in the statement / scope of work. If changes to the stated work hours are required <br />due to conditions outside of VectorUSA's control result in additional cost those costs will be addressed in the form <br />of a written change order. <br />VectorUSA / 8647 E 911 St., Rancho Cucamonga, CA 91730Confidential <br />