Laserfiche WebLink
Education <br />Master of Engineering/2006/Electrical <br />Engineering/INSA Lyon Engineering <br />University, Lyon, France <br />Erasmus Study Abroad Program/ <br />2004-2005/Sheffield University, <br />Sheffield, United Kingdom <br />Registrations <br />2021/PE/Electrical/CA #23478 <br />Professional Affiliations <br />INSA <br />WEAT <br />Training/Seminars <br />Electrical Substation Design <br />Fundamentals, 2016 <br />Overhead Distribution Systems, 2015 <br />SKM PowerTools, Protection and <br />Coordination training, 2012 <br />SKM PowerTools, Arc Flash Evaluation <br />training, 2011 <br />SKM PowerTools, Electrical Grounding <br />and Applications 2017 <br />Years of Experience:16 <br />Agata Ristow, PE <br />Electrical, Instrumentation & Control <br />Agata Ristow, PE, has 16 years of electrical engineering experience for the water, wastewater and solid <br />waste, food and beverage, pharmaceuticals and oil and gas markets. Her expertise encompasses the <br />design, implementation, and project management of electrical system improvement and SCADA projects <br />for water and wastewater treatment plants across the United States. Additionally, she has experience in <br />electrical engineering for transportation applications including project management, light rail, catenary, <br />and signaling. <br />RELEVANT EXPERIENCE <br />South Holly WTP High Service Pump Station Motor and Switchgear Replacement and Electrical <br />Improvements, City of Fort Worth, TX.* Electrical/Instrumentation Design Engineer and Deputy Project <br />Manager. Provided design for the replacement of medium voltage motor control centers, transformers, 480V <br />motor control centers, instrumentation and control design at the High Service Pump Station. Coordinated <br />with the subconsultants in orderto assemble project deliverables. Responsible for utility coordination <br />and put together preliminary power system studies including short circuit and motor starting studies. Led <br />design and construction meetings, handled the construction documentation and compiled all the meeting <br />minutes related to the project. Reviewed the electrical submittals and answered contractor's RFIs. <br />Witcher Pump Station, Oklahoma City Water Utilities Trust, Oklahoma City, OK.* Electrical/ <br />Instrumentation Design Engineer. The improvements included replacement of the lagoon pumps, <br />electrical gear, and the installation of new emergency generators along with paralleling switchgear at <br />the main pump station. The new generators are included to comply with current ODEQ regulations related <br />to backup power systems. This project also includes piping, valves, power, SCADA, structural and other <br />miscellaneous improvements or upgrades necessary for this project. Responsible for review of contractor <br />submittals and RFIs during the construction phase. <br />Airport to Wasson SCADA Improvements, Centurion Pipeline, TX.* Electrical and Instrumentation <br />Design Engineer for the preliminary design phase of the project. The project included two collection <br />sites, nine third -party LACT units, and several pipeline segments. Centurion Pipeline wanted to perform <br />leak detection and ensure any pumps pushing crude oil into their pipelines would be inhibited in case <br />of leak detected alongside the associated pipeline. Each facility included a new electrical rack with <br />PLC,120/240V distribution equipment, instrumentation and radio communication equipment. The <br />Airport Junction station included a new electrical building with new PLC panel and several upgrades <br />to the existing facilities to conform to Centurion Pipeline current design standards. Preliminary design <br />deliverables included site plans, one -line diagrams, network architectures, conduit and cable schedules, <br />radiopath studies and opinion of probable construction cost. Responsible for coordination with the <br />FAA for development of the aeronautical study for the Airport Junction site. Also responsible for utility <br />coordination via the Centurion Pipeline Power Group. <br />Vista Ridge Water Supply Project, Garney Construction, TX.* Lead Electrical Engineer/ Electrical QA/ <br />QC. This design -build project consisted of well field, several miles of well collection line, over 100 miles <br />of large -diameter treated transmission main, multiple pump stations, water treatment facilities, and a <br />metering station/customer delivery point through primarily rural areas. Work included development of <br />program design standards, specifications and details, route study, preparation of easement documents, <br />pipeline design, coordination and incorporation of hydraulic and surge protection recommendations, <br />constructability review, permitting and construction phase services. Responsibilities included conceptual <br />design, equipment selection, technical specification writing, assisting junior staff with development <br />City of Santa Ana Water Resources Division <br />RFP 22-0021 May 24, 2022 <br />[ B-33 ] /�/ ARDURRA <br />