Education
<br />Master of Engineering/2006/Electrical
<br />Engineering/INSA Lyon Engineering
<br />University, Lyon, France
<br />Erasmus Study Abroad Program/
<br />2004-2005/Sheffield University,
<br />Sheffield, United Kingdom
<br />Registrations
<br />2021/PE/Electrical/CA #23478
<br />Professional Affiliations
<br />INSA
<br />WEAT
<br />Training/Seminars
<br />Electrical Substation Design
<br />Fundamentals, 2016
<br />Overhead Distribution Systems, 2015
<br />SKM PowerTools, Protection and
<br />Coordination training, 2012
<br />SKM PowerTools, Arc Flash Evaluation
<br />training, 2011
<br />SKM PowerTools, Electrical Grounding
<br />and Applications 2017
<br />Years of Experience:16
<br />Agata Ristow, PE
<br />Electrical, Instrumentation & Control
<br />Agata Ristow, PE, has 16 years of electrical engineering experience for the water, wastewater and solid
<br />waste, food and beverage, pharmaceuticals and oil and gas markets. Her expertise encompasses the
<br />design, implementation, and project management of electrical system improvement and SCADA projects
<br />for water and wastewater treatment plants across the United States. Additionally, she has experience in
<br />electrical engineering for transportation applications including project management, light rail, catenary,
<br />and signaling.
<br />RELEVANT EXPERIENCE
<br />South Holly WTP High Service Pump Station Motor and Switchgear Replacement and Electrical
<br />Improvements, City of Fort Worth, TX.* Electrical/Instrumentation Design Engineer and Deputy Project
<br />Manager. Provided design for the replacement of medium voltage motor control centers, transformers, 480V
<br />motor control centers, instrumentation and control design at the High Service Pump Station. Coordinated
<br />with the subconsultants in orderto assemble project deliverables. Responsible for utility coordination
<br />and put together preliminary power system studies including short circuit and motor starting studies. Led
<br />design and construction meetings, handled the construction documentation and compiled all the meeting
<br />minutes related to the project. Reviewed the electrical submittals and answered contractor's RFIs.
<br />Witcher Pump Station, Oklahoma City Water Utilities Trust, Oklahoma City, OK.* Electrical/
<br />Instrumentation Design Engineer. The improvements included replacement of the lagoon pumps,
<br />electrical gear, and the installation of new emergency generators along with paralleling switchgear at
<br />the main pump station. The new generators are included to comply with current ODEQ regulations related
<br />to backup power systems. This project also includes piping, valves, power, SCADA, structural and other
<br />miscellaneous improvements or upgrades necessary for this project. Responsible for review of contractor
<br />submittals and RFIs during the construction phase.
<br />Airport to Wasson SCADA Improvements, Centurion Pipeline, TX.* Electrical and Instrumentation
<br />Design Engineer for the preliminary design phase of the project. The project included two collection
<br />sites, nine third -party LACT units, and several pipeline segments. Centurion Pipeline wanted to perform
<br />leak detection and ensure any pumps pushing crude oil into their pipelines would be inhibited in case
<br />of leak detected alongside the associated pipeline. Each facility included a new electrical rack with
<br />PLC,120/240V distribution equipment, instrumentation and radio communication equipment. The
<br />Airport Junction station included a new electrical building with new PLC panel and several upgrades
<br />to the existing facilities to conform to Centurion Pipeline current design standards. Preliminary design
<br />deliverables included site plans, one -line diagrams, network architectures, conduit and cable schedules,
<br />radiopath studies and opinion of probable construction cost. Responsible for coordination with the
<br />FAA for development of the aeronautical study for the Airport Junction site. Also responsible for utility
<br />coordination via the Centurion Pipeline Power Group.
<br />Vista Ridge Water Supply Project, Garney Construction, TX.* Lead Electrical Engineer/ Electrical QA/
<br />QC. This design -build project consisted of well field, several miles of well collection line, over 100 miles
<br />of large -diameter treated transmission main, multiple pump stations, water treatment facilities, and a
<br />metering station/customer delivery point through primarily rural areas. Work included development of
<br />program design standards, specifications and details, route study, preparation of easement documents,
<br />pipeline design, coordination and incorporation of hydraulic and surge protection recommendations,
<br />constructability review, permitting and construction phase services. Responsibilities included conceptual
<br />design, equipment selection, technical specification writing, assisting junior staff with development
<br />City of Santa Ana Water Resources Division
<br />RFP 22-0021 May 24, 2022
<br />[ B-33 ] /�/ ARDURRA