Laserfiche WebLink
Education <br />SAN Institute Industrial Control <br />System Cyber Security Course/2017 <br />MBA/2005/California State University, <br />San Marcos <br />Certificate in Concurrent Design and <br />Engineering Manufacturing1996/ <br />San Diego State University <br />BS/1987/Mathematics/University of <br />Washington <br />Certifications <br />Microsoft Certified Systems <br />Administrator (MCSA) <br />Certified Wonderware Developer <br />Certified Maximo Administrator <br />Certified MasterWater Distribution <br />System and Sanitary Sewer System <br />Modeler, Bentley Systems, Inc. <br />Certified Nessus Auditor <br />Years of Experience:25 <br />Av <br />ARDURRA <br />Chuck Reuck <br />Electrical, Instrumentation & Control, SCADA <br />Chuck Reuck has more than 20 years of professional experience in the planning, design, construction, <br />and implementation of instrumentation, and control systems, particularly in the water and wastewater <br />industry. <br />RELEVANT EXPERIENCE <br />1724 — Electrical Infrastructure Improvements (Ell) & Digester Gas Beneficial Use Program <br />SCADA Integration and Coordination, San Bernardino Municipal Water Department,CA. <br />Construction Manager forthe Ell project that involved installing over 4,000 LF of mega duct bank in order <br />to energize the new equipment constructed as a part ofSBMWD's Digester Gas Beneficial Use Program. <br />This project also included the addition of ELM switchgear and a new transformer to switch the power <br />from SCE to plant power. Chuck assisted the SBMWD in completing this project, coordinating with SCE <br />and ultimately transferring the electrical power to SBMWD's onsite fuel cell, which takes digester gas and <br />converts this to electricity to be used onsite forthe WRF. Chuck performed all of the SCADA Integration <br />work to make all of the projects operational. (Construction Value: $5M) <br />DCS System Upgrade Project, Elsinore Valley Municipal Water District,CA. Acted as Owner's <br />Representative during DCS upgrades of District's largest wastewater treatment plant, ensuring vendor <br />performed upgrades with minimal impacts to operations. Oversaw all upgrades and coordinated all <br />commissioning efforts with staff. This included replacing legacy Modicon PLCS with remote 1/0. <br />SCADA Extension of Staff, City of Oceanside, CA. SCADA Consultant providing project management <br />and design services for the upgrade of the City's SCADA system. Responsible for upgrades to software and <br />hardware for 4 treatment plants and over 70 remote sites. The work involved replacing two legacy iFix <br />systems and one standalone Intouch system with Wonderware System Platform as well replacing over <br />100 PLCS. Designed new network layouts that increase system autonomy and redundancy. Was heavily <br />involved in troubleshooting new 2.4 GHz radio network connectivity issues. Additionally, assisted with <br />implementation of new WIMs for department wide use. While working at the City, he attended the Water <br />Loss Prevention class and assisted Oceanside staff in data gathering for their annual water loss auditfor <br />2017 and 2018. <br />SCADA System Upgrade Project, City of Ottawa. Assistant Project Engineer responsible for the <br />implementation of SCADA servers, including SQL server failover clusters, active directory and group policy <br />design, and Network Access Protection (NAP) using 802.1x security. <br />Northwest Recycled Water SCADA Top -End Design and Implementation, Inland Empire Utilities <br />Agency, CA. Assistant Project Engineer responsible for the design and implementation of SCADA servers, <br />software, networking, and Microsoft operating systems. Other responsibilities included the development <br />of the Operational Database Management System (ODMS) based on Rockwell Software's OSI-PI database, <br />testing and commissioning procedures, 0&M manuals, reporting, and fully commissioning a pilot SCADA <br />system. Inland Empire Utilities Agency has put very high importance on this project due to it being the <br />basis for the new SCADA system that will control IEUA's entire system. <br />Twin Oaks Valley Water Treatment Plant, CH2MHill, CA. Assistant Project Engineer responsible for <br />the PLC programming of the chemical control processes for the world's largest submerged membrane <br />water filtration plant. The PLC platform was Allen Bradley ControlLogix. Created over 20 custom reports for <br />compliance and monitoring purposes using Microsoft Excel andT-SQL. Configured several Thin clients and <br />terminal servers utilizing ACP ThinManager software. <br />City of Santa Ana Water Resources Division <br />RFP 22-002 1 May 24, 2022 <br />[ B-35 ] /�j ARDURRA <br />