Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
0 <br />CHUCK REUCK I ARDURRA I Paget <br />Integration Manager.* Responsible for managing 10 system <br />integrators responsible for SCADA design and implementations <br />for water and wastewater agencies. Other responsibilities were to <br />manage multiple projects to ensure they met schedule, scope, and <br />budgets using earned vaIuetech niques. He also assisted in proposal <br />development, company corporate strategies, and company business <br />development. <br />Senior Software Engineer.* Responsible for planning, designing, and <br />configuring SCADA system servers and associated network hardware <br />for water and wastewater agencies. Other responsibilities included <br />drafting project proposals and developing master plans and preliminary <br />design reports. Chuck was also heavily involved with configuring SCADA <br />servers, software, operating systems, and network switches. <br />Capital Facilities Coordinator, Vallecitos Water District, CA.* <br />Responsible for all aspects of contract management including, but <br />not limited to, developing SCADA system upgrade specifications and <br />monitoring contractor progress during the implementation phase. <br />Served as SCADA and IT representative on the District's vulnerability <br />assessment team. Also served as Project Manager for various capital <br />facilities projects including tank recoating, pump station replacement, <br />outfall slip lining, new construction, and rehab work. Also responsible <br />for managing the District's Maximo CMMS implementation. He <br />designed and oversaw the installation of 13 sewer manhole monitoring <br />RTUs. His routine duties involved performing hydraulic water modeling <br />of proposed developments and new facilities. <br />Applications Specialist.* Responsible for creating HMI databases and <br />displays, and configuring alarm notification software. Configured all <br />desktop computers and printers, as well as assisted in system start-up <br />of two water agency SCADA systems with a total of 100 plus remote <br />facilities. Also responsible for programming multiple HMI applications <br />including Wonderware and FactoryLink for water agencies, configured <br />a 35-node radio network utilizing spread spectrum radios, developed <br />ON manuals for water agencies, and conducted operator training for <br />agency staff. <br />*Work performed prior to joining Ardurra <br />/\/ARDURRA [ B_36 ] City of Santa Ana Water Resources Division <br />RFP 22-002 1 May 24, 2022 <br />