Laserfiche WebLink
Education <br />BS/1986/Civil Engineering, California <br />State University, Long Beach <br />Post Graduate Coursework Wastewater <br />Treatment/Water Resources <br />Registrations <br />1998/PE/Civil/CA #59166 <br />Certifications <br />Qualified SWPPP Developer (QSD) <br />Qualified SWPPP Practitioner (QSP) <br />#59166 <br />Professional Affiliations <br />American Society of Civil Engineers <br />(ASCE), Fellow <br />American PublicWorks Association <br />(APWA), Member <br />American Council of Engineering <br />Companies (ACEC), Orange County <br />President-elect <br />Past Educator, Rancho Santiago <br />Community College, Public Works <br />Program, Santa Ana, CA <br />Publications <br />Stormwater Strategy, <br />Civil Engineering, 2003 <br />Awards and Recognition <br />2020/ASCE Outstanding Civil <br />Engineer in the Private Sector— in <br />Recognition of Contributions to Civil <br />Engineering <br />2016/APWA BEST Awards Top Leader of <br />the Year in the Private Sector <br />Years of Experience: 39 <br />ARDURRA <br />Lisa M. Penna, PE, EASCE, QSD <br />Principal -in -Charge <br />Lisa M. Pen na, PE, FASCE, QSD, Vice President, Regional Director at Ardurra, brings broad experience <br />in public works engineering, project and construction management. She has served in key technical <br />and management roles in projects involving flood control, transportation, water, wastewater and <br />environmental. Her experience includes planning, design, inspection, construction, and the development <br />of short- and long-term capital improvement programs. <br />Lisa has worked with numerous local agencies and water districts throughout Southern California. In <br />addition, her experience includes conceptual planning, environmental studies, preliminary engineering, <br />plans, specifications and estimates, and construction management of roadways, drainage and flood <br />control, wastewater and urban runoff and hydraulic modeling. During her career, Lisa has engaged in the <br />planning, design, and construction of millions of dollars in public works projects. <br />Through Lisa's experience with local capital projects and project/program management, she is <br />knowledgeable in NEPA and CEQA requirements, federal grant requirements, GreenBook and APWA <br />standards and many public agency policies and procedures. She has actively participated in the Public <br />Works education program at Santiago Canyon College in Orange, CA, where she has taught several courses <br />and contributed to the development of the curriculum. Lisa served as Deputy City Engineer for the City <br />of Seal Beach between 1993 and 1995, Assistant City Engineer for the City of Laguna Beach from 1998 to <br />2000, as Deputy City Engineer for the City of Dana Point from 2000 to 2002, and as CIP Program Manager <br />for Laguna Beach from 2009 to 2013 helping the City deliver more than $10 million in capital projects. <br />RELEVANT EXPERIENCE <br />Fountain Valley 15-Year Sewer CIP Phase 1 Planning, Phase 2 Design, Phase 3 Construction <br />Management, City of Fountain Valley, CA. Principal-in-Charge/Project Manager responsible for the <br />City's Year Two Sewer Capital Improvement Program planning, design and construction. TheYear 2 CIP <br />projects include a total of 19 segments scattered throughout the City's service area. These 19 segments <br />total approximately 5,300 LF of sewer reconstruction or repair and consist of approximately 2,350 LF <br />of new sewers,1,700 LF of plastic liner, 950 LF of pipe bursting, and 300 LF of spot repairs. The Phase <br />1 project scope of work analyzed the City's recently completed 15-year CIP to recommend projects to <br />complete in FY 2010/11(year 2 of the CIP). The Phase 2 project scope of work included providing bidding <br />assistance, engineering construction support, geotechnical investigation, survey and optional services <br />associated with the preparation of traffic control plans and utility potholing. <br />Ocean Avenue Alley Waterline and Sewer Replacements Project from Main Street to 1 st Street <br />Design Services, City of Seal Beach, CA. Principal-in-Charge/Project Manager responsible for this <br />$1.6-million project to prepare full design plans, specifications and cost estimates for alley pavement <br />improvements and associated utilities <br />Fountain Valley 15-Year Sewer Master Plan Supplement, City of Fountain Valley, CA. Principal- <br />in-Charge/Project Manager responsible for this $3-million project to perform a condition assessment <br />using CCTV inspection, update the City's GIS with current information and prepare recommended CIP <br />improvements. <br />On -Call Civil Engineering and Project Management, City of Long Beach, CA. Principal -in -Charge <br />for this contract for municipal engineering services. Ardurra has provided plans, specifications and cost <br />estimates for more than $15 million in public works improvements since 2009. <br />City of Santa Ana Water Resources Division <br />RFP 22-002 1 May 24,2022 [ B-1 ] ��/ARDURRA <br />