<br />LISAM.PENNA I ARDURRA I Paget
<br />Capital Improvement Program Management, City of Newport
<br />Beach, CA. Project Manager for multiple capital projects and policies,
<br />including an ADA transition plan, standards updates, Pacific Coast
<br />Highway relinquishment, signal maintenance contract oversight, a
<br />street lighting policy review, CIP master scheduling, wastewater master
<br />plan review and a plan review of the Civic Center project.
<br />OC-9 Transmission Pipeline, City of Huntington Beach, CA.
<br />Project Manager for installation of more than 15,000 LF of 32-inch-
<br />diameter PVC and ductile iron water transmission pipeline. The project
<br />installed a corrosion protection system, a new distribution pipeline and
<br />new fire hydrant assemblies. The cost was approximately $12 million.
<br />Circle Way Storm Drain and Stair Repair, City of Laguna Beach,
<br />CA. Principal -in -Charge for $1-million beach access improvements
<br />project. Oversaw design and construction process. Project upgraded
<br />the 18-inch-diameter reinforced concrete pipe (RCP) storm drain to
<br />a 60-inch RCP with an aesthetically treated flap gate at the ocean
<br />outlet. In addition, the project made improvements to the hilltop stairs
<br />accessing the beach, installed a continuous deflective separation (CDS)
<br />urban runoff diversion, moved water lines and sewer pipelines and
<br />upgraded landscaping, irrigation and electrical.
<br />Clean Water Program, City of San Diego, CA. Construction
<br />Manager responsible for all activities associated with change and claims
<br />management for the $10-billion clean water program. The program
<br />included the construction of new wastewater and recycled water
<br />pipelines, treatment plants, energy facilities, lift stations and tunnels
<br />throughout San Diego County. Responsibility also included monthly
<br />reporting and quality control.
<br />Lift Station No.2 Pump Replacement, South Coast Water
<br />District, City of Laguna Beach, CA. Principal -in -Charge for the
<br />design engineering of the District's main sewage lift station. The facility
<br />collects wastewater from South Laguna Beach and conveys it to the
<br />South Orange County Wastewater Authority Treatment Plant. The
<br />project evaluated replacement of two pumps and motor assemblies.
<br />On -Call Engineering Services, City of Lake Forest, CA. Principal -in
<br />Charge for this multi -year contract providing staff augmentation
<br />services. Responsibilities include municipal engineering, development
<br />land use application and permit plan review, public works inspection,
<br />capital improvement project design, construction management and
<br />inspection, and water quality program management.
<br />Waterline Replacement Program, City of Bell Gardens and
<br />Paramount, CA. Design engineer responsible for many of the City's
<br />water distribution main replacement projects,including design of
<br />ductile iron and PVC distribution mains, fire hydrant placement, water
<br />services and other appearances.
<br />Sewer Assessment District No.195, City of Norco, CA. Project
<br />Manager/Design Engineer responsible for 80 miles of sewer collection
<br />pipelines installed to alleviate reliance on underground septic facilities.
<br />Sewer Collection System, City of Laguna Beach, CA. Project
<br />Manager responsible for the design and construction of over30,000
<br />LF of new collector sewers to re-route plumbing systems from
<br />unmaintainable residential lots.
<br />Los Robles Area Sewer Reconstruction, City of Laguna Beach,
<br />CA. Project Manager for this sewer rehabilitation project, responsible
<br />for design and construction of abandonment of over 7,500 LF of existing
<br />sewers in easements along private property and the construction of
<br />new sewers in the public right-of-way fronting the properties. The
<br />project was extremely challenging in that each individual private
<br />residence had to be"re-lateraled"to the new public sewer in the street.
<br />Belmont Shore Sewage Lift Station, Long Beach Water
<br />Department, Belmont Shore, CA. Project Engineer (Lead Design
<br />Engineer and Construction Manager) responsible for this lift station
<br />rehabilitation project, which included a new building, a modern
<br />telemetry system, three 250-horsepowervariable speed powered pumps
<br />and the construction of a temporary lift station to provide service while
<br />the new lift station was being constructed. This lift station rehabilitation
<br />project, located in the heart of the Belmont Shore community, was
<br />implemented to facilitate the increased wastewater flows generated by
<br />the upstream communities of Naples and South Long Beach,
<br />Five Grade Separation Engineering Plan Check, Orange County
<br />Transportation Authority, Orange County, CA. Water, sewer,
<br />drainage plan checker responsible for risk analysis, plan review,
<br />and extensive coordination. Responsible for quality assurance and
<br />reviewing other design teams' plans for constructability, bidability,
<br />and cost efficiency as well as adherence to local agency requirements.
<br />The project design criteria review addressed BNSF, Metrolink, AREMA,
<br />three cities, one county, the transportation authority, the flood control
<br />district, and several utilities'specifications. Ardurra was responsible
<br />for providing constructability reviews for the utilities including sewer,
<br />water, bridges and roadway PS&E of five grade separation projects in
<br />the BNSF/Metrolink Corridor through Placentia, Fullerton and Anaheim
<br />at Orangethorpe, Lakeview, Tustin/Rose, Placentia and Kraemer.
<br />South Laguna Streetscape and Pedestrian Improvements,
<br />City of Laguna Beach, CA. Project manager responsible for project
<br />and construction management of several capital projects including
<br />this $2-million TEA grant funded community improvement project.
<br />Responsible or the planning, design, CEQA/ NEPA compliance, grant
<br />funding insurance, traffic engineering, R/W engineering, landscape
<br />architecture, community liaison and construction management.
<br />/�j ARDURRA [ B_z l City of Santa Ana Water Resources Division