<br />ROB WEBER I ARDURRA I Page 2
<br />Trunk Sewer Main Replacement, City of Escondido, CA. Principal -
<br />in -Charge. The City of Escondido's Trunk Sewer Main is a key piece of
<br />the City's sewer infrastructure system. The trunk sewer collects sewage
<br />from approximately 30% of the City and conveys it to the Hale Avenue
<br />Resource Recovery Facility (HARRF). The trunk sewer was constructed
<br />in 1959 and originally served as the outfall from the City's treatment
<br />facility to a lift station. However, when the HARRF was constructed, the
<br />pipeline was repurposed to serve as a trunk sewer in the City's collection
<br />system. In recent years, sections of the pipeline have been failing,
<br />requiring emergency repairs to keep this key piece of infrastructure
<br />in service. The original pipeline was constructed of 24-and 27-inch-
<br />diameter RCP; however, as emergency repairs were made, 30- and
<br />36-inch-diameter PVC were installed. This project replaces 5 segments
<br />of trunk sewer remaining from the original construction, which totals
<br />6,900 linear feet of trunk sewer.
<br />Ontario Ranch Phase 2 Water Main Improvements, Ontario
<br />Municipal Utilities Company/City of Ontario, CA. Principal -in -
<br />Charge for approximately 1.5 miles of 30" diameter CML&C WSP, PZ
<br />925, along Grove Avenue between Eucalyptus Avenue and Chino
<br />Avenue, design of an interim pressure reducing valve (PRV) station at
<br />the intersection of Grove Avenue and China Avenue to break pressure
<br />from the PZ 1010 to PZ 925, situated on the north side of Chino Avenue
<br />approximately 500 feet east of Grove Avenue,1.6 miles of 18" diameter
<br />CML&C WSP, PZ 1010, along Chino Avenue between Grove Avenue and
<br />the Chino Avenue Bridge ((ucamonga Creek).
<br />San Antonio Ave 30-inch Diameter Transmission Water Main,
<br />Ontario Municipal Utilities Company/City of Ontario, CA.
<br />Principal -in -Charge for design for 2,900 linear feet of new 30-inch
<br />CML&C WSP; abandonment of approximately 3,700linear feet of
<br />existing 18-inch steel pipe.
<br />Upas Street Pipeline Replacement, City of San Diego, CA.
<br />Principal -in -Charge. Upas Street project extends from Lindbergh Field
<br />east along Upas Street, crossing 1-5 and State Route 163, and bordering
<br />Balboa Park and Morley Field through sensitive habitat, residential
<br />neighborhoods and utility -congested streets east to 30th Street,
<br />including heavy traffic areas of Park Blvd. and Sth Avenue between
<br />Upas Street and Robinson Avenue. Design details include 14,980 LF
<br />of 8-inch through 12-inch PVC distribution main, 8,160 LF of24-inch
<br />cement mortar lined and tape coated steel pipe with impressed current
<br />cathodic protection,1,640 LF of 30-inch HDPE transmission main to
<br />be installed via horizontal directional drilling, 210 LF of 18-inch HDPE
<br />transmission main to be installed via slip -lining, 4 pressure reducing
<br />stations (3 replacement and 1 new) with flow metering and SCADA
<br />telemetry, and 4.9 miles of trench paving and street resurfacing.
<br />La Costa Pump Station, leucadia Wastewater District, CA.
<br />Principal -in -Charge for the rehabilitation of an existing 2,400-gpm
<br />packaged sewer lift station including new pumps, repairs to steel
<br />structure, new electrical gear and controls, and new force main bypass
<br />connections.
<br />Neighborhood 1 Pump Station Rehabilitation, Olivenhain
<br />Municipal Water District, CA. Project Manager for the preliminary
<br />and final design for replacement of 550-gpm custom -designed wet pit/
<br />dry pit sewer lift station with duplex pumps in series. Project re-sed
<br />the existing wet well and constructed a new dry well with above -grade
<br />electrical building for new MCCs and controls.
<br />Baticluitos Pump Station, leucadia Wastewater District,
<br />CA. Project Manager for the preliminary and final design of the
<br />rehabilitation of 1,000-hp sewer lift station. Project included pump
<br />and valve replacement, wet well lining, station bypassing, site piping,
<br />installation of emergency bypass vaults, modifications to the existing
<br />valve vault, re -roofing, modification of the HVAC system and other
<br />miscellaneous repairs.
<br />La Jolla View Reservoir and Pipeline Replacement, City of San
<br />Diego, CA. Principal -in -Charge. PDR and PS&E for 3.1-MG reservoir,
<br />3,000 feet of 30-inch welded steel pipe, and demolition of two outdated
<br />reservoirs. Reservoir is comprised of prestressed concrete tank that is
<br />fully buried with limited surface features. Project includes extensive
<br />habitat restoration and public outreach support due to the tank location
<br />in a scenic, hilltop park in the coastal La Jolla area.
<br />Calavo Pump Station Replacement and El Cajon Tank
<br />Modifications, Helix Water District, CA. Principal -in -Charge for the
<br />replacement of an existing pump station and replacement of an existing
<br />steel tank roof with an aluminum geodesic dome roof. Project included a
<br />new pump station building with new pumps, motors, control valves, and
<br />mechanical piping,16-inch waterline replacement, new dome roof for
<br />the adjacent reservoir, extensive coordination and phasing to maintain
<br />service to the existing pump station and miscellaneous site improvements
<br />consisting of grading and drainage improvements. The new pump station
<br />was successfully put into service along with the retrofitted tank.
<br />Twin Oaks Reservoir No. 2, Vallecitos Water District, CA. Deputy
<br />Project Manager for construction of a buried 40-MG prestressed
<br />concrete reservoir, including mass grading operations, connections to
<br />existing facilities and miscellaneous site improvements. This complex
<br />project involved coordination with the existing facilities, originally
<br />planned for a smaller tank, and development of the new reservoir and
<br />piping layouts to fit within the existing constraints. Project construction
<br />documents were developed in three phases: Phase I Mass Grading,
<br />Phase II Reservoir Improvements, and Phase III Site Improvements.
<br />/�/ARDURRA B-12 City of Santa Ana Water Resources Division
<br />RFP 22-002 1 May 24, 2022