Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Education <br />BS/1999/Civil Engineering/San Diego <br />State University <br />Registrations <br />2005/PE/Civil/CA #C67536 <br />Professional Affiliations <br />Dolores Salgado, PE <br />Design Services, Plan Check, Pipeline Design <br />Dolores Salgado, PE, has more than 20 years of experience in the planning and design of civil <br />transportation and water and sewer projects. Her civil transportation experience includes extensive <br />light rail transit and bus rapid transit. Water and sewer experience includes water distribution and sewer <br />collection facilities. Dolores is bilingual in English and Spanish and provides technical translation services <br />to support public outreach services. <br />RELEVANT EXPERIENCE <br />Rock Springs Sewer Project, Vallecitos Water District, CA. Project Engineer to prepare a planning <br />and alignment alternatives study, followed by the design PS&E and preparation of environmental <br />documents for CEQA compliance. The final project is comprised of 2,700 feet of 12-to 15-inch gravity <br />sewer alignment to replace an existing 8-inch sewer, cured -in -place pipe lining of300 feet of 8-inch <br />gravity sewer, new and rehabilitated manholes, improved access paths for sewer system operators, and <br />improvements to the HOA greenbelt hardscape and landscaping. <br />Board of Governance, Self -Help <br />640 Reservoirs, Otay Water District, CA. Project Engineer for the final design of twin 10-MG partially <br />Enterprises Since2018 <br />buried, prestressed concrete reservoirs, associated valve vaults, two pressure reducing stations, civil site <br />Industry Advisory Board Member, <br />improvements, over 14,000 LF of new pipelines, and demolition of an existing conventionally reinforced <br />Bakersfield College MESA Program <br />concrete tank (1.6 MG) and abandonment of associated piping. <br />2016-current <br />Stage Ranch Road Pipeline, Elsinore Valley Municipal Water District, CA. Project Manager <br />ACEC, Water Resources Committee <br />for design of approximately 2,400 LF of 8-inch-diameter potable water pipeline. The project required <br />ACEC, Kern County Chapter, Secretary <br />approximately 300 LF of special material (CML&C welded steel pipe) due to the Elsinore Fault Zone, <br />which has a high probability of fault rupture. A hydraulic analysis was performed to determine if the <br />ACEC, Kern County Chapter <br />new 8-inch-diameter pipeline can supply fire flows of 1,500 gpm at 20 pounds per square inch residual <br />ASCE, Los Angeles Section, Water <br />pressure without exceeding the maximum flow velocities of 10 feet per second to minimize potential for <br />Policy Committee, Chair <br />system hydraulic surge and to lim it pressure drops during fires. <br />Bakersfield College MESA Program, <br />On -Call Development Reviews and Plan Checking Services, City of Shafter, CA. Project Manager <br />Board Chair <br />for an as -needed contract since 2019. Provides the City with review comments and recommendations <br />Self -Help Enterprises, Board Member <br />to provide quality control and ensure projects comply with the City Standards, City Municipal Code and <br />Water Association of Kern County, <br />Ordinances, California Subdivision Map Act, Project Conditions of Approval, Tentative Subdivision Maps, <br />Board Member <br />Tentative Parcel Maps, City Master Plans, stormwater regulations, constructability, completeness, and <br />Water Association of Kern County, <br />sustainability for the benefit of future occupants. Reviews were conducted for parcel maps, final maps, <br />Water Summit Committee <br />grading plans, street improvement plans, sewer plans, drainage plans and studies and reports. <br />Awards On -Call Development Reviews, Plan Checking, and Field Inspection Services, City of Vista, <br />Graham Reservoir and Athletic Fields CA. Project Manager for an on -call contract providing professional engineering services to theCity's <br />Project—ACEC/APWA/ASCE/CELSOC Community Development Department related to plan checks review of water services, both domestic and <br />640 Reservoirs— ASCE firewater, to ensure compliance with the City of Vista's Conditions of Approval, American Water Works, <br />Years of Experience:23CaIiforniaWater Work Standards, Department ofHealthServices,CountyFire MarshaIandconstructability. <br />Following project approval, construction management and inspections services includes the following <br />services and recording pertinent information in the daily reports: <br />• Review that potholing of existing utilities has been completed and that conflicts have been checked <br />prior to the start of trenching operations. <br />• Check that the materials and equipment match the approved submittals. <br />ARDURRA • Document that materials arrive at the site undamaged and are properly stored. <br />City of Santa Ana Water Resources Division 8-23 /� ARDURRA <br />RFP 22-0021 May 24, 2022 <br />