Education
<br />BS/1999/Civil Engineering/San Diego
<br />State University
<br />Registrations
<br />2005/PE/Civil/CA #C67536
<br />Professional Affiliations
<br />Dolores Salgado, PE
<br />Design Services, Plan Check, Pipeline Design
<br />Dolores Salgado, PE, has more than 20 years of experience in the planning and design of civil
<br />transportation and water and sewer projects. Her civil transportation experience includes extensive
<br />light rail transit and bus rapid transit. Water and sewer experience includes water distribution and sewer
<br />collection facilities. Dolores is bilingual in English and Spanish and provides technical translation services
<br />to support public outreach services.
<br />RELEVANT EXPERIENCE
<br />Rock Springs Sewer Project, Vallecitos Water District, CA. Project Engineer to prepare a planning
<br />and alignment alternatives study, followed by the design PS&E and preparation of environmental
<br />documents for CEQA compliance. The final project is comprised of 2,700 feet of 12-to 15-inch gravity
<br />sewer alignment to replace an existing 8-inch sewer, cured -in -place pipe lining of300 feet of 8-inch
<br />gravity sewer, new and rehabilitated manholes, improved access paths for sewer system operators, and
<br />improvements to the HOA greenbelt hardscape and landscaping.
<br />Board of Governance, Self -Help
<br />640 Reservoirs, Otay Water District, CA. Project Engineer for the final design of twin 10-MG partially
<br />Enterprises Since2018
<br />buried, prestressed concrete reservoirs, associated valve vaults, two pressure reducing stations, civil site
<br />Industry Advisory Board Member,
<br />improvements, over 14,000 LF of new pipelines, and demolition of an existing conventionally reinforced
<br />Bakersfield College MESA Program
<br />concrete tank (1.6 MG) and abandonment of associated piping.
<br />2016-current
<br />Stage Ranch Road Pipeline, Elsinore Valley Municipal Water District, CA. Project Manager
<br />ACEC, Water Resources Committee
<br />for design of approximately 2,400 LF of 8-inch-diameter potable water pipeline. The project required
<br />ACEC, Kern County Chapter, Secretary
<br />approximately 300 LF of special material (CML&C welded steel pipe) due to the Elsinore Fault Zone,
<br />which has a high probability of fault rupture. A hydraulic analysis was performed to determine if the
<br />ACEC, Kern County Chapter
<br />new 8-inch-diameter pipeline can supply fire flows of 1,500 gpm at 20 pounds per square inch residual
<br />ASCE, Los Angeles Section, Water
<br />pressure without exceeding the maximum flow velocities of 10 feet per second to minimize potential for
<br />Policy Committee, Chair
<br />system hydraulic surge and to lim it pressure drops during fires.
<br />Bakersfield College MESA Program,
<br />On -Call Development Reviews and Plan Checking Services, City of Shafter, CA. Project Manager
<br />Board Chair
<br />for an as -needed contract since 2019. Provides the City with review comments and recommendations
<br />Self -Help Enterprises, Board Member
<br />to provide quality control and ensure projects comply with the City Standards, City Municipal Code and
<br />Water Association of Kern County,
<br />Ordinances, California Subdivision Map Act, Project Conditions of Approval, Tentative Subdivision Maps,
<br />Board Member
<br />Tentative Parcel Maps, City Master Plans, stormwater regulations, constructability, completeness, and
<br />Water Association of Kern County,
<br />sustainability for the benefit of future occupants. Reviews were conducted for parcel maps, final maps,
<br />Water Summit Committee
<br />grading plans, street improvement plans, sewer plans, drainage plans and studies and reports.
<br />Awards On -Call Development Reviews, Plan Checking, and Field Inspection Services, City of Vista,
<br />Graham Reservoir and Athletic Fields CA. Project Manager for an on -call contract providing professional engineering services to theCity's
<br />Project—ACEC/APWA/ASCE/CELSOC Community Development Department related to plan checks review of water services, both domestic and
<br />640 Reservoirs— ASCE firewater, to ensure compliance with the City of Vista's Conditions of Approval, American Water Works,
<br />Years of Experience:23CaIiforniaWater Work Standards, Department ofHealthServices,CountyFire MarshaIandconstructability.
<br />Following project approval, construction management and inspections services includes the following
<br />services and recording pertinent information in the daily reports:
<br />• Review that potholing of existing utilities has been completed and that conflicts have been checked
<br />prior to the start of trenching operations.
<br />• Check that the materials and equipment match the approved submittals.
<br />ARDURRA • Document that materials arrive at the site undamaged and are properly stored.
<br />City of Santa Ana Water Resources Division 8-23 /� ARDURRA
<br />RFP 22-0021 May 24, 2022
<br />
|