My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:35 AM
Creation date
10/4/2022 11:02:32 AM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2022-158-03
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/15/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Long Pham, PE <br />SPEC SERVICES, INC. <br />Electrical and Controls <br />Long Pham has more than 32 years of experience in control systems/electrical <br />engineering and engineering management. His experience includes working in <br />/ <br />the petrochemical industry for ExxonMobil, Chevron, ConocoPhillips, Phillips <br />ILI' <br />66, Tesoro, BP, Rio Tinto Minerals, Pacific Pipeline Company, Calpine, INEOS <br />Polypropylene Plant, and Venoco, and for utilities and municipal agencies. <br />REGISTRATION <br />His experience also includes engineering service estimating, planning, and <br />2003/CA/Professional <br />conceptual and detailed design of projects for water/wastewater agencies, <br />Engineer/Electrical/16621 <br />refineries, petroleum terminals, pumps stations, and gas compressor stations. <br />Professional <br />Engineer <br />Engineer/Control <br />In addition to leading a number of projects, Long is responsible for overseeing <br />systems/7346 <br />a group of 16 engineers and designers. His responsibilities include technical <br />2016/1-1I/Professional <br />quality control for development and staffing of the department, engineering <br />Engineer/General/17106 <br />standards and procedures, technical performance, quality assurance and <br />control, and successful execution of projects within budget and schedule <br />EDUCATION <br />requirements. <br />1991/MS/Electrical <br />Engineering/California <br />State University, <br />Experience <br />Long Beach <br />1989/BS/Electrical <br />Standby Power and Reliability Improvements at Plant Nos.1 and 2, <br />Engineering/magna cum <br />Orange County Sanitation District - Fountain Valley, CA: Project Electrical <br />laude/california State <br />University, Long Beach <br />Engineer providing supervision of two 20ookW emergency generator sets <br />including the design of 12kV switchgear and generator control with manual <br />EXPERIENCE <br />and automatic synchronizing system. Selection and design of plant's power <br />With SPEC Services for 11 <br />monitoring SCADA system for 12kV incoming services, central generating <br />years; with other firms for <br />station, emergency generators and medium and low voltage power distribution <br />21 years <br />system. <br />Plant 1 Trickling Filter Replacement, Orange County Sanitation <br />District - Fountain Valley, CA: Project Engineer for the electrical and <br />controls component. The project included preliminary development of design <br />memoranda to set the scope of work, followed by detailed design of new power <br />distribution and standby power systems and automation including controls <br />interface with the existing plant SCADA systems. A new pump station with VFD <br />pumps, trickling filters; underdrain system ventilation blowers and trickling <br />filter arms complete the project. <br />Plant 2 EPSA Pump Station Replacement, Orange County Sanitation <br />District - Fountain Valley, CA: Project Electrical and Controls Engineer <br />for the electrical and controls component. The project includes preliminary <br />development of technical memoranda to set the scope of work followed by <br />detailed design of a new electrical distribution center fed from the plant central <br />generation plant, 8MW standby power generation including 15kV switchgear, <br />3000 HP VFD, 480V MCCS and transformers to support the new pump station <br />housing five 3000 HP pumps that will discharge 480MGD from the plant. <br />Automated control design interfaces with existing plant SCADA system from <br />independent PLCs at the new Annex and existing Ocean Outfall Booster Station <br />
The URL can be used to link to this page
Your browser does not support the video tag.