My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:35 AM
Creation date
10/4/2022 11:02:32 AM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2022-158-03
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/15/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Long P h a m, PE to provide "seamless" transfer of control. Plant design was made with expanded <br />(Continued) flexibility for maintenance outages and future growth. <br />Arrow Lante Treatment Facility Project, Valley County Water District - <br />Baldwin Park, CA: Project Electrical Engineer providing detailed engineering <br />for the electrical and control systems engineering and design for the Arrow <br />Lante Treatment Facility. Also provided control and automation portion of this <br />project, which includes PLC and HMI programming, testing and commissioning. <br />Coordination of Calgons ISEP system, Trojan's LPUV system, Layne's air <br />strippers, and MC2 off -gas system required extra effort on the project. <br />Automatic controls using several PLC platforms, a main computer, and variable <br />frequency drives for pumps to control water levels and flows are highlights of <br />the control systems. <br />PVRWRF Main Entrance Gate Modification Project, Eastern Municipal <br />Water District - Perris, CA: Project Electrical Engineer providing civil/ <br />structural, electrical, and control system preliminary and final engineering/ <br />design for the Main Entrance Gate Modification project at Perris Valley Regional <br />Water Reclamation Facility (PVRWRF). This project is to widen the driveway <br />with an additional three feet on both sides, replace the existing gate, and install <br />new split face block walls and signage at the main entrance. <br />El Centro Lift Station Pipe Replacement Project, Eastern Municipal <br />Water District - Perris, CA: Project Electrical Engineer providing electrical <br />and control system engineering/design support for El Centro Lift Station Pipe <br />Replacement project. This project replaces discharge piping of the existing <br />wet well pumps. To keep the lift station in operation during construction, <br />temporary electric pumps will be installed in the bypass manhole to divert <br />water to the lift station bypass Tee connection. SPEC will develop electrical <br />documents and drawings to complete the bid package so that EMWD can bid out <br />and select a contractor. <br />Sanderson Lift Station Pump Electrification Project, Eastern Municipal <br />Water District - Perris, CA: Project Electrical Engineer providing preparation <br />of electrical and control system preliminary and final engineering/design for <br />the electrification of existing gas engine driven vertical turbine pump at the <br />Sanderson Lift Station. Scope of work included coordination, power, grounding, <br />motor and control schematics, and instrumentation of a new Variable Frequency <br />Drive and motor installation in lieu of the engine. SPEC utilized their licensed <br />civil engineers for foundation modifications and mechanical engineers provided <br />input into the physical pump modifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.