MARC HASLINGER, PE
<br />Principal -In - Charge - Huitt- Zollars
<br />Having experience in both the public and private engineering sectors, Marc Haslinger
<br />brings a broad wealth of experience to his jobs. He has managed and designed
<br />numerous municipal, residential, and commercial projects throughout Southern
<br />California from initial planning and feasibility studies through final design, construction,
<br />and construction management. His experience has included residential, commercial,
<br />and industrial developments; potable and reclaimed water transmission mains and flood
<br />control facilities; roadway improvements; and construction management. Haslinger is
<br />well -versed in the tools of construction management, contract administration, planning,
<br />design, and processing.
<br />Complementing Haslinger's project management capabilities is a hands-on approach
<br />and technical knowledge of computer programs in the area of coordinate geometry,
<br />hydraulics, hydrology, structures, spreadsheets, critical path networking, management,
<br />and other tools necessary for a successful project.
<br />RELEVANT PROJECT EXPERIENCE
<br />Citywide Sanitary Sewer and Domestic Improvements - Santa Ana, CA
<br />Western Avenue Rehabilitation — Buena Park, CA
<br />Irvine Center Drive, Sand Canyon to Barranca Parkway — Irvine, CA
<br />Irvine Center Drive, 1-405 Freeway to Lake Forest Drive — Irvine, CA
<br />Bake Parkway, 1-405 to Irvine Center Drive — Irvine, CA
<br />City of Dallas Facilities Capital Planning, Design and Construction - Dallas, TX'
<br />CARL TAYLOR, PE, LEEn AP
<br />Civil Engineer - Huitt-Zollars
<br />Carl Taylor has a strong background in public infrastructure projects. He has worked
<br />on arterial highways and intersections, local and neighborhood streets, master plan
<br />and local storm drains, city and community parks, trails, streetscapes, vehicular and
<br />pedestrian bridges, city halls, libraries, community centers, memorials and plazas,
<br />parking lots, sewer and water facilities, and pedestrian and bicycle/pedestrian trails.
<br />During his professional career, Taylor has provided plans, specifications, estimates,
<br />and construction administration and support for numerous city, county, redevelopment
<br />agency, federal, and community facilities district projects.
<br />RELEVANT PROJECT EXPERIENCE
<br />OC Parks On -Call Projects — Orange County, CA
<br />» Mathis Trail Repair, Aliso & Wood Canyons
<br />» Creek Restoration, Wagon Wheel Regional Park
<br />» General Development Plan, OC Zoo
<br />» Santiago Creekbank Repair at Arden Modjeska
<br />» Historic Site, Modjeska Canyon Nature Preserve
<br />» Tijeras Creek Trail Repair, O'Neill Regional Park
<br />» Trail Crossing Replacement, Santiago Oaks Regional
<br />Park
<br />» Wagon Wheel Creek Restorations, Thomas F. Riley
<br />Wilderness Park
<br />Oso Parkway & Antonio Parkway Intersection Improvements — Orange County,
<br />CA
<br />Center Street — Anaheim, CA
<br />Townsend Place — Pasadena, CA
<br />HUITT-ZOLIARS City of Santa On -Call Water Resources Engineering Services RFP No. 22-002
<br />
|