My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC. (6)
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 4:11:05 PM
Creation date
10/4/2022 11:09:35 AM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2022-158-05
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2025
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dr. Htun is a Professional Engineer with more than 10 years of experience specializing <br />in surface water modeling, hydraulic design, and water resource management. <br />Currently, he conducts hydrological and hydraulic studies for urban development. He <br />designs and analyzes energy dissipators for a major arterial highway improvement <br />against downstream erosion. He designs Low Impact Developments for flood control <br />and hydrologic condition of concern while preparing the Water Quality Monitoring <br />Report, Drainage Report, and Stormwater Pollution Prevention Plan. <br />RELEVANT PROJECT EXPERIENCE <br />East Los Angeles College East and Corporate Stormwater - Monterey Park, CA <br />Huitt-Zollars is currently working with the College Project Team and BuildLACCD <br />to program, approve, and design stormwater harvest-and-biotreat systems at the <br />Corporate Center and for the East Drainage area on East Campus. Underground <br />collection systems include storm drain, diversion vaults, pump vaults, valve and <br />magmeter vaults, controls, and electrical connections. Biofiltration basins are designed <br />per CASQA Standards. At the East Campus, raised biofiltration planters are proposed <br />as an amenity for LA Metro bus riders. Huitt-Zollars coordinated with the City of <br />Monterey Park to review the scope of work at both locations, and identify a setback <br />from the existing sewer line along Avenida Cesar Chavez. <br />City of Huntington Beach McCallen Park Revised PS&E - Huntington Beach, CA <br />East Los Angeles College East and Corporate Stormwater - Monterey Park, CA <br />McCallen Park Water Quality Improvements - Huntington Beach, CA <br />RY N KI , <br />Nyrlr'ology & Hydraulics Engineer - in - Training - Huiit -Zolla <br />Ryan Kim is an Engineer -in -Training with 3 years of experience. He has had ample <br />experience in stormwater infrastructure design using a variety of hydrologic and <br />hydraulic softwares for urban development and public works projects. He has been <br />responsible for the corresponding plans, specifications, and estimates in addition to <br />the drafting of technical reports. <br />RELEVANT PROJECT EXPERIENCE <br />Environmental CEQA Mitigated Negative Declaration Preparation - Santa Ana, CA <br />Cypress Avenue MPD System T-2 Storm Drain and Street Improvements - Fontana, CA <br />Baseline Road Storm Drain Project - Rialto, CA <br />1193 W Merrill Ave St. Widening - Riatto, CA <br />Oakmont Park and Live Oak Canyon Creek Design Evaluation and Repair - Redlands, CA <br />East Los Angeles College Northeast Drainage Stormwater - Monterey Park, CA <br />East Los Angeles College East and Corporate Stormwater - Monterey Park, CA <br />Los Angeles Mission College South Arroyo Storm Water - Sylmar, CA <br />HU[TTZOLM <br />City of Santa On -Call Water Resources Engineering Services RFP No. 22-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.