My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC. (6)
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 4:11:05 PM
Creation date
10/4/2022 11:09:35 AM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2022-158-05
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2025
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROXANNA RIVERA,PE, PTO E,LEED AP <br />Traffic Engineer - Huitt-Zollars <br />Rivera has more than 24 years of experience in design and project management for <br />municipal public works, infrastructure, environmental, and hydrology and hydraulics <br />projects. Her experience includes the design of water and wastewater infrastructure, <br />storm sewer design, drainage area mapping, preparation of environmental documents, <br />and construction management. <br />Rivera has completed the Texas Department of Transportation Qualificiation <br />certification for Local Government Project Procedures (LGPP) to manage federally <br />funded programs. She has managed several design and construction projects that <br />were funded with federal funds. She has also worked extensively with the reporting <br />requirements with TxDOT and FHWA so that municipalities reimbursed under the <br />terms of the Local Project Advanced Funding Agreements (LPAFA). <br />RELEVANT PROJECT EXPERIENCE <br />Oxnard Blvd / Wagon Wheel Road Traffic Signal — Oxnard, CA <br />Oxnard Blvd / Orchard Place Traffic Signal — Oxnard, CA <br />Oxnard Blvd / Vineyard Ave Traffic Signal — Oxnard, CA <br />Vineyard Avenue at Town Center Drive Traffic Signal — Oxnard, CA <br />Lantana Traffic Circulation Study, Lantana Community — Denton County, TX <br />Johnny Murad brings 25 years of experience in civil engineering consulting. He has assisted numerous clients <br />in site selections, feasibility studies, preliminary construction cost estimates, earthwork estimates, plan <br />check and permit fee estimates, conceptual site planning, final design, and construction administration. His <br />experience gives him a good understanding of project costing techniques and calculations, which can help <br />keep the project cost at a minimum without losing efficiency and, thereby, help his clients stay within their <br />planned project budget and maintain their strength in the market. <br />RELEVANT PROJECT EXPERIENCE <br />Alder Avenue, Casa Grande Drive, Summit Avenue, and Mango Avenue Sewer <br />Improvements — Rialto, CA <br />Redlands Boulevard Sewer Improvements — Moreno Valley, CA <br />Brodiaea Avenue, Cactus Avenue, Joy Street, Gilbert Street, Rebecca Street, <br />Frederick Street, and Heacock Street Sewer Improvements — Moreno Valley, CA <br />San Bernardino Avenue Sewer Improvements — San Bernardino, CA <br />City of Rialto, Tract No. 16304 Sewer Improvements — Rialto, CA <br />HUITHOLLARS <br />City of Santa On -Call Water Resources Engineering Services RFP No. 22-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.