My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC. (6)
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 4:11:05 PM
Creation date
10/4/2022 11:09:35 AM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2022-158-05
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2025
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Armando Fernandez <br />HZ Proposal No. P309095.07 <br />February 19, 2019 <br />Page 4 <br />Plans will be submitted as follows: <br />a 2 - Hard Copies Design Plans Only for 30% Progress Submittal <br />(HZ will continue with design during City review) <br />• 2 - Hard Copies Design Plans Only for 60% Progress Submittal <br />(HZ will continue with design during City review) <br />• 2 — Hard Copies of PS&E for 90% Submittal <br />(Design is on hold during review) <br />• 1- Hard Copy of PS&E for Final Submittal <br />G. Estimates: Huitt-Zollars will provide water improvements relevant quantities. Probable <br />cost would be estimated using best engineering practices including bid item list. <br />H. Speciflcations: The City of Santa Ana will provide sample of special provisions for editing. <br />I. Construction Administration: Project Manager and staff will remain available during the <br />bidding phase and construction phase to respond to RFI's and review contractor submittals. <br />After construction, contractor redlines will be provided to develop record drawings. <br />Optional Services <br />J. Environmental Support: Installation of new pipeline with removal of existing pipeline as <br />part of maintenance or repair, would qualify as a statutory exemption if less than one mile in <br />length, unless there are unusual circumstances (i.e., "a reasonable possibility of significant <br />environmental effects"), in which case an MND may be required. We are providing a <br />budget for each. Our environmental consultant will assist the City to determine if an MND <br />is necessary. The MND includes air quality, gas emissions, cultural, and noise/vibrations <br />studies. <br />Deliverables <br />♦ Geotechnical Report <br />♦ CEQA Statutory Exemption or MND (Optional) <br />♦ Plans Only (30%) <br />♦ Plans Only (60%) <br />♦ Plans, Specifications and Quantity Estimates (90%) <br />♦ Final Plans, Specifications and Quantity Estimates (Title Sheet Mylar) <br />♦ CADD Files <br />Provided by the City of Santa Ana <br />♦ Utility As -Built Plans <br />♦ Bid List Items <br />♦ Special Provisions and CADD Standards <br />HUB I I L l JLLARS City of Santa On -Call Water Resources Engineering Services REP No. 22-002 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.