My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2025 1:49:09 PM
Creation date
11/7/2022 4:04:03 PM
Metadata
Fields
Template:
Contracts
Company Name
ENVIRONMENTAL CONSTRUCTION, INC.
Contract #
P 18-6491
Agency
Public Works
Council Approval Date
11/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. This Change Order Number 009, Item C provides additional compensation to Contractor for items <br /> described in COR#035—New Gate Guide Flat Bar with all items complete in place.Work includes <br /> modifications to gate rail system. <br /> Work to be paid at agreed price in accordance with Section 7-3.7-"Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 009, Item C is two thousand, six hundred eighty-two and <br /> 861100 dollars ($2,682.86). This sum constitutes full and complete compensation for furnishing <br /> all labor, materials, equipment, tools, transport, and incidentals including all markups by reason <br /> of this Change Order 009, Item C. Zero (0) working days are added as part of this Change Order <br /> 008, Item C. <br /> CHANGE ORDER NUMBER 008 ITEM C COST: $2,682.86 <br /> 4. This Change Order Number 009, Item D provides additional compensation to Contractor for <br /> extra work as described in COR#036— Light Pole Plate Welds. Work items include protection <br /> of light post hand holes with welding. <br /> Work to be paid at agreed price in accordance with Section 7-3.7—"Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 009, Item D is nine thousand, six hundred eighteen and <br /> 441100 dollars ($9,618.44). This sum constitutes full and complete compensation for furnishing <br /> all labor, materials, equipment, tools, transport, and incidentals including all markups by reason <br /> of this Change Order 009, Item D. Zero (0)working days are added as part of this Change Order <br /> 008, Item D. <br /> CHANGE ORDER NUMBER 008 ITEM D COST: $9,618.44 <br /> 5. This Change Order Number 009, Item E provides additional compensation to Contractor for items <br /> as described in COR#037—Meter Relocation—Electrical Sign Shift which includes work to repair <br /> and replace electrical sign due to car collision. <br /> Work to be paid at agreed price in accordance with Section 7-3.7-"Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 009, Item E is nine thousand, nine hundred thirty-five <br /> and 331100 dollars ($9,935.33). This sum constitutes full and complete compensation for <br /> furnishing all labor, materials, equipment, tools, transport, and incidentals including all markups <br /> by reason of this Change Order 009, Item E. Two (2) working days are added as part of this <br /> Change Order 009, Item E. <br /> CHANGE ORDER NUMBER 009, ITEM E COST: $9,935.33 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.