3. This Change Order Number 009, Item C provides additional compensation to Contractor for items <br /> described in COR#035—New Gate Guide Flat Bar with all items complete in place.Work includes <br /> modifications to gate rail system. <br /> Work to be paid at agreed price in accordance with Section 7-3.7-"Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 009, Item C is two thousand, six hundred eighty-two and <br /> 861100 dollars ($2,682.86). This sum constitutes full and complete compensation for furnishing <br /> all labor, materials, equipment, tools, transport, and incidentals including all markups by reason <br /> of this Change Order 009, Item C. Zero (0) working days are added as part of this Change Order <br /> 008, Item C. <br /> CHANGE ORDER NUMBER 008 ITEM C COST: $2,682.86 <br /> 4. This Change Order Number 009, Item D provides additional compensation to Contractor for <br /> extra work as described in COR#036— Light Pole Plate Welds. Work items include protection <br /> of light post hand holes with welding. <br /> Work to be paid at agreed price in accordance with Section 7-3.7—"Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 009, Item D is nine thousand, six hundred eighteen and <br /> 441100 dollars ($9,618.44). This sum constitutes full and complete compensation for furnishing <br /> all labor, materials, equipment, tools, transport, and incidentals including all markups by reason <br /> of this Change Order 009, Item D. Zero (0)working days are added as part of this Change Order <br /> 008, Item D. <br /> CHANGE ORDER NUMBER 008 ITEM D COST: $9,618.44 <br /> 5. This Change Order Number 009, Item E provides additional compensation to Contractor for items <br /> as described in COR#037—Meter Relocation—Electrical Sign Shift which includes work to repair <br /> and replace electrical sign due to car collision. <br /> Work to be paid at agreed price in accordance with Section 7-3.7-"Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 009, Item E is nine thousand, nine hundred thirty-five <br /> and 331100 dollars ($9,935.33). This sum constitutes full and complete compensation for <br /> furnishing all labor, materials, equipment, tools, transport, and incidentals including all markups <br /> by reason of this Change Order 009, Item E. Two (2) working days are added as part of this <br /> Change Order 009, Item E. <br /> CHANGE ORDER NUMBER 009, ITEM E COST: $9,935.33 <br /> Page 2 of 4 <br />