My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ENVIRONMENTAL CONSTRUCTION, INC. (WELL NO. 29 IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2025 1:49:09 PM
Creation date
11/7/2022 4:04:03 PM
Metadata
Fields
Template:
Contracts
Company Name
ENVIRONMENTAL CONSTRUCTION, INC.
Contract #
P 18-6491
Agency
Public Works
Council Approval Date
11/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. This Change Order Number 009, Item F provides additional compensation to Contractor for items <br /> as described in COR #042 — 12 inch MWD Line, Flush and De-Chlor which includes work to <br /> complete flushing of 12 inch MWD Line. <br /> Work to be paid at agreed price in accordance with Section 7-3.7- "Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 009, Item F is nine thousand, eight hundred thirty and <br /> 451100 dollars ($9,830.45). This sum constitutes full and complete compensation for furnishing <br /> all labor, materials, equipment, tools, transport, and incidentals including all markups by reason <br /> of this Change Order 009, Item F. Ten (10)working days are added as part of this Change Order <br /> 009, Item F. <br /> CHANGE ORDER NUMBER 009, ITEM F COST: $9,830.45 <br /> 7. This Change Order Number 009, Item G provides additional compensation to Contractor for items <br /> as described in COR #038 -- Site Wall Plaster Repair which includes work to repair damaged to <br /> exterior wall damaged by car collision. <br /> Work to be paid at agreed price in accordance with Section 7-3.7- "Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 009, Item G is four thousand, four hundred eighty-seven <br /> and 67/100 dollars ($4,487.67). This sum constitutes full and complete compensation for <br /> furnishing all labor, materials, equipment, tools, transport, and incidentals including all markups <br /> by reason of this Change Order 009, Item G. Five (5) working days are added as part of this <br /> Change Order 009, Item G. <br /> CHANGE ORDER NUMBER 009, ITEM G COST: $4,487.67 <br /> 8. This Change Order Number 009, Item H provides additional compensation to Contractor for items <br /> as described in COR#040—Replace SCE Meter box which includes work to furnish and install a <br /> replacement SCE meter due to car collision. <br /> Work to be paid at agreed price in accordance with Section 7-3.7-"Agreed Price" of the Standard <br /> Specifications for Public Works Construction. <br /> The total cost of Change Order Number 009, Item H is twelve thousand, eight hundred twenty- <br /> two and 871100 dollars ($12,822.87). This sum constitutes full and complete compensation for <br /> furnishing all labor, materials, equipment, tools, transport, and incidentals including all markups <br /> by reason of this Change Order 009, Item H. Two (2) working days are added as part of this <br /> Change Order 009, Item H. <br /> CHANGE ORDER NUMBER 009, ITEM H COST: $12,822.87 <br /> CHANGE ORDER NUMBER 009 GRAND TOTAL: $113,032.94 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.