Laserfiche WebLink
TASK 1: PRE -DESIGN <br />Preliminary design shall include Kick-off meeting with City Staff <br />(representatives from Public Works Agency and Santa Ana <br />Library) to discuss scope of work, project goals and objectives, <br />potential elements and issues, schedule, review of existing <br />information and site investigation. <br />• Deliverables shall include a Work Task Plan, Schedule, <br />Geotechnical Report and Site Survey. Work Plan should <br />include key milestones and highlight tasks associated with <br />historical registry requirements. <br />TASK 2: CONCEPT DESIGN <br />Concept design shall include up to three (3) meetings with City <br />Staff to brainstorm and review potential layouts. Additionally, <br />outreach shall be conducted In up to three (3) public meetings <br />to provide the community an opportunity to review the concept <br />designs and provide input. Please provide creative methods <br />used to engage the community on needs and priorities while <br />keeping the project on schedule. i.e. workshops, online polls. <br />• Deliverables shall include up to three (3) schematic concept <br />designs, with a minimum of six (6) perspective drawings/ <br />renderings for each the following: exteriorfrom Civic Center <br />Dr., main level book stacks, kid's area, teen space, Santa <br />Ana History Room and east entrance from exterior for <br />fundraising and use in presentations to potential library <br />donors, would also be required, <br />Final Concept shall be approved by City Staff <br />TASK 3: DESIGN DEVELOPMENT (50% PLANS) <br />Design development will involve the schematic development of <br />plans based on the approved conceptual design plan, which shall <br />include but is not limited to survey, civil design, geotechnical <br />investigation and report (for soils analysis), Infiltration testing„ <br />architectural design, landscape architectural design, structural <br />design, interior design, furniture selection, electrical engineering, <br />mechanical and plumbing engineering, draft technical <br />specifications and "opinion of estimated cost'. <br />Deliverables shall include a 50% set of plans, including site <br />section studies, draft specification, "Opinion of Probable <br />Cost". <br />`Z SCOPE OF SERVICES AND SCHEDULE <br />TASK 4: CONSTRUCTION DOCUMENTS (90%AND 100% <br />PLANS) <br />Construction Documents (CDs) shall include finalizing approved <br />deliverables from the Design Development phase, This includes <br />the provision of detailed engineering and construction drawings <br />that will serve as the basis for both bidding and construction by a <br />general contractor. <br />• Deliverables shall include 90% and 100% plans, structural <br />calculations, CASP report, final technical specifications, <br />finalized "Opinion of Probable Cost". 100% plans will <br />go through a constmctability review that could lead to <br />comments and recommendations that should also be <br />addressed and completed as part of this deliverable. <br />Plans. Plans shall include, but are not limited to the following, <br />• Tide Sheet <br />• Civil Engineering <br />» Site Erosion Plan <br />» Parking lot along Ross Street with Access Control <br />(parking meters, gate, bollards, etc.) <br />» Horizontal and Vertical Control Plan <br />» Grading And On -Site Drainage Plan <br />Site Utility Plan <br />Landscape Architectural <br />» Site LayouUConstruction Plans And Details (including <br />plumbing) <br />» Site Sections, as applicable <br />» Planting Plans/Details/Notes <br />» Irrigation Plans/Details/Calculations/Notes <br />• Architectural <br />» Demolition Plans (Basement, 1st, & 2nd Floors) <br />» Construction Plans (Basement, 1st, & 2nd Floors) <br />» Reflected Ceiling Plans (Basement, 1st, & 2nd Floors) <br />» Furniture Plans (Basement, 1st, & 2nd Floors) <br />» Exterior Elevations <br />» Interior Elevations <br />Mechanical and Plumbing Plans/T-24 <br />» Electrical Plans, as applicable <br />Architectural Details <br />» Structural Calculations <br />CITY OF SANTA ANA, NEW COMMUNITY CENTER 1 22 <br />